My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6617 ASSOCIATED BLVD AMAZON 2022-05-23
>
Address Records
>
ASSOCIATED BLVD
>
6617
>
AMAZON
>
6617 ASSOCIATED BLVD AMAZON 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:14:32 AM
Creation date
1/27/2021 8:52:41 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6617
Tenant Name
AMAZON
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> Lighting, Motor, and Electrical Permit Checklist, Pg. 5 LTG-CHK <br /> 2015 Washington State Energy Code Compliance Forms for Commercial Buildings including R2,R3,R4 over 3 stories and all R1 Revised Nov 2017 <br /> DWS5-Everett WA Tenant Improvement Date 5/22/2020 <br /> The following information is necessary to check a permit application for compliance with the lighting,motor,and electrical requirements in the <br /> Applicability Location in building Department <br /> (yes,no,na) Code Section Component Compliance information required in permit documents Documents Notes <br /> MOTORS,TRANSFORMERS,ELECTRIC METERS,INTERIOR TRANSPORTATION <br /> C405.6 Electrical Include electrical transformer schedule on electrical plans; <br /> transformers indicate transformer size,efficiency,or exception taker <br /> Dwelling unit Indicate on electrical plans that each dwelling unit in Group R-2 <br /> C405.7 electrical energy has a separate electrical energy meter <br /> consumption <br /> Electric motor Include all motors,including fractional hp motors,in electric <br /> C405.8 efficiency motor schedule on electrical plans;indicate hp,rpm,rated <br /> efficiency.or exception applied <br /> For luminaires in each elevator cab,provide calculated average <br /> efficacy of combined fixtures that indicates efficacy is not less <br /> than 35 lumens per watt; <br /> C405.9.1 Elevator cabs Indicate rated watts per cfm for elevator cab ventilation fans do <br /> not exceed 0.33 watts per cfm <br /> Indicate automatic controls that de-energize lighting and <br /> ventilation fans when elevator is stopped and unoccupied for a <br /> period of 15 minutes or more <br /> Escalators and Indicate escalators comply with ASME A17.1/CSA B44; <br /> C405.9.2 moving walks automatic controls are configured to reduce operational speed tc <br /> the minimum permitted when not in use <br /> C405.9.3 Regenerative drive Indicate all one-way down or reversible escalators are provided <br /> with a variable frequency regenerative drive <br /> DOCUMENTATION AND SYSTEM REQUIREMENTS TO SUPPORT COMMISSIONING(Cx) <br /> Indicate that all electrical systems(receptacles,transformers, <br /> motors,vertical and horizontal transportation)for which the <br /> WSEC requires control functions and/or configuration to <br /> Scope of electrical erform specific functions are required to be commissioned <br /> C408.3 power and lighting total building lighting load is>20 kW,or where total <br /> systems lighting load of luminaires requiring daylight sensing and/or <br /> commissioning occupancy control>10 kW,indicate that all automatic lighting <br /> control systems are required to be commissioned;or provide <br /> building lighting power calculation demonstrating eligibility for <br /> _ex.-otion' <br /> Indicate Cx requirements in plans and specifications for all <br /> icable electrical and lighting control systems per C408; <br /> In.-ude general summary with at minimum Items thru 4 of the <br /> C405.13 Commissioning Cx plan per C408.1.2 including:narrative description of <br /> C408.1.1 requirements in activities,responsibilities of the Cx team,schedule of activities <br /> C408.1.2 construction including verification of project close out documentation per <br /> C408.1.4.2 documents C103.6.and conflict of interest plan(if reauiredl: <br /> C103.6 Include in general summary that a Cx project report or <br /> Compliance Checklist(Figure C408.1.4.2)shall be completed <br /> by the Certified Cx Professional and provided to the owner prior <br /> to the final electrical inspection <br /> Functional Identify in plans and specifications the intended operation of all <br /> C408.3.1 performance testing equipment and controls during all modes of operation,including <br /> criteria interfacing between new and existing-to-remain system, <br /> PROJECT CLOSE OUT DOCUMENTATION <br /> Project dose out Indicate in plans that project close out documentation is required <br /> C103.6.3 documentation including WSEC lighting compliance forms and calculations that <br /> requirements document all interior and exterior lighting area and/or surface <br /> types,lighting power allowances and installed densities <br /> If"no"is selected for any question,provide explanation: <br /> End of Lighting,Motor&Transformer Permit Documents Checklist <br />
The URL can be used to link to this page
Your browser does not support the video tag.