My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6617 ASSOCIATED BLVD AMAZON Geotech Report 2022-10-25
>
Address Records
>
ASSOCIATED BLVD
>
6617
>
AMAZON
>
Geotech Report
>
6617 ASSOCIATED BLVD AMAZON Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:38:54 PM
Creation date
1/27/2021 9:00:47 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6617
Tenant Name
AMAZON
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • KLEINFELDER <br /> • Brio10 People.Right Solutions. <br /> • <br /> • &te. <br /> June 1, 202011' tfJJJ® <br /> • Kleinfelder Project No.: 20203884.001A <br /> • SEP 0 3 2020 <br /> MG2 <br /> • 1101 Second Ave, Ste 100 CITY of <br /> • Seattle, Washington 98101 Permit ServeTT <br /> es <br /> • Attention: Mr. Matthew Goelzer AIA, LEED AP <br /> • <br /> • Subject: Geotechnical Study <br /> • Proposed AMZL DWS5 Warehouse Improvements <br /> • 6617 Associated Blvd <br /> • Everett, WA 98203 <br /> • Dear Mr. Goelzer: <br /> • Kleinfelder is pleased to present this report summarizing our geotechnical study for the <br /> • proposed AMZL DWS5 Warehouse Improvements project located at 6617 Associated Blvd in <br /> • Everett, Washington. The purpose of our study was to evaluate subsurface conditions at the <br /> • project site to provide design and construction recommendations for the proposed <br /> improvements. The conclusions and recommendations presented in this report are subject to <br /> • the limitations presented in Section 5. <br /> • We appreciate the opportunity to provide geotechnical engineering services to you on this <br /> • project. If you have any questions regarding this report or if we can be of further service, please <br /> • do not hesitate to contact Marcus Byers at (425) 301-0106 or Brian Crystal at (949) 727-4466. <br /> • Respectfully submitted, <br /> • <br /> • KLEINF • ; <br /> COLLIF,jt <br /> • 4C ofWA11O. <br /> • , ,� t <br /> • nojr : 4' <br /> • UNA 1✓ <br /> • <br /> • Brett O'Brien, PE Marcus Byers, PE, P.Eng <br /> • Geotechnical Engineer Principal Geotechnical Engineer <br /> • Senior Project Manager <br /> • <br /> • 20203884.001A/SEA20R110164 Page 1 of 1 June 1, 2020 <br /> ©2020 Kleinfelder <br /> • KLEINFELDER 14710 NE 87th Street,Suite 100, Redmond,WA 98052 p 1425.636.7900 f 1425.636.7901 <br /> • <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.