My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6617 ASSOCIATED BLVD AMAZON Geotech Report 2022-10-25
>
Address Records
>
ASSOCIATED BLVD
>
6617
>
AMAZON
>
Geotech Report
>
6617 ASSOCIATED BLVD AMAZON Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:38:54 PM
Creation date
1/27/2021 9:00:47 AM
Metadata
Fields
Template:
Address Document
Street Name
ASSOCIATED BLVD
Street Number
6617
Tenant Name
AMAZON
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />• (Kt:El/VP-ELDER <br /> �� <br />• <br /> TABLE OF CONTENTS <br />• <br />• Section Page <br />• 1 INTRODUCTION 1 <br />• 1.1 PROJECT DESCRIPTION 1 <br />• 1.2 SCOPE OF SERVICES 1 <br /> • 1.2.1 Task 1 — Background Data Review 2 <br /> 1.2.2 Task 2 — Field Exploration 2 <br /> • 1.2.3 Task 3— Laboratory Testing 3 <br /> • 1.2.4 Task 4— Floor Flatness/ Floor Levelness Testing 3 <br /> 1.2.5 Task 5—Visual Pavement Condition Assessment 3 <br /> • 1.2.6 Task 6—Geotechnical Analyses and Report Preparation 4 <br /> • 2 SITE AND SUBSURFACE CONDITIONS 6 <br /> 2.1 GENERAL SITE DESCRIPTION 6 <br /> • <br /> 2.2 VISUAL PAVEMENT ASSESSMENT 6 <br /> • 2.2.1 Pavement Condition 6 <br /> • 2.2.2 Existing Pavement Thicknesses 7 <br /> 2.3 SUBSURFACE CONDITIONS 7 <br /> • 3 FLOOR FLATNESS / LEVELNESS TESTING 9 <br /> • 3.1 GENERAL COMMENTS 9 <br /> 3.2 APPLICABLE STANDARDS & SPECIFICATIONS 9 <br /> • 4 CONCLUSIONS AND RECOMMENDATIONS 11 <br /> • 4.1 GENERAL 11 <br /> • 4.2 FOUNDATIONS 11 <br /> 4.2.1 General 11 <br /> • 4.2.2 Spread Footing Foundations for Building Improvements 11 <br /> • 4.2.3 Short Drilled Piles for Building Improvements 13 <br /> 4.3 SEISMIC DESIGN 14 <br /> • 4.3.1 2018 IBC Seismic Design Parameters 14 <br /> • 4.3.2 Liquefaction Hazard 15 <br /> • 4.4 PAVEMENT REHABILITATION AND NEW PAVEMENT SECTIONS 15 <br /> 4.4.1 General 15 <br /> • 4.4.2 Proposed Truck Routes (Heavy-Duty Pavement) 16 <br /> • 4.4.3 Proposed Delivery Van Routes (Medium-Duty Pavement) 16 <br /> 4.4.4 Aggregate Base 16 <br /> • 4.4.5 Construction Considerations 17 <br /> • 4.5 EARTHWORK 18 <br /> • 4.5.1 General 18 <br /> 4.5.2 Site Preparation 18 <br /> • 4.5.3 Unstable Subgrade Conditions 19 <br /> • 4.5.4 Foundation Excavations 20 <br /> 4.5.5 Structural Fill Material and Compaction Criteria 21 <br /> • 4.5.6 Excavation Characteristics 21 <br /> • 4.5.7 Temporary Excavations 22 <br /> • 4.6 SOIL CORROSIVITY 22 <br /> 5 ADDITIONAL SERVICES 24 <br /> • 5.1 PLANS AND SPECIFICATIONS REVIEW 24 <br /> • 5.2 CONSTRUCTION OBSERVATION AND TESTING 24 <br /> 6 LIMITATIONS 25 <br /> • 7 REFERENCES 28 <br /> • <br /> • 20203884.001A/SEA20R110164 Page iii of iv June 1, 2020 <br /> • <br /> ©2020 Kleinfelder <br /> • <br />
The URL can be used to link to this page
Your browser does not support the video tag.