Laserfiche WebLink
101.11PA6,-A <br /> PUBLIC RKS PERMIT •teApplied: 1/29/2018 <br /> City of Everett Permit Services Public Works Permit#: P/29/20 053 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: B1805-015 <br /> Everett,WA 98201 Planning Reference#: SEPA16-027 <br /> (425) 257-8810 Public Works Fee: $18,300.58 <br /> 2 7 JUN 2018 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> YOUNG MENS CHRISTIAN ASSOCIATION JUSTIN GOROCH, PE BCRA <br /> 2720 ROCKEFELLER AVE 414 STEWART ST SUITE#200 <br /> EVERETT, WA, 98201 SEATTLE, WA, 98101 <br /> PHONE: PHONE: 2536274367 <br /> TAX PARCEL ID#: 29053100400500 SITE ADDRESS: 4730 COLBY AVE <br /> DESCRIPTION: SITE DEVELOPMENT FOR NEW YMCA FACILITY <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett`Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans, SWPPP, and drainage report approved by the City of Everett Public Works Department dated <br /> 6/12/2018.Approved plans must remain on job-site at all times. Contractor is required to build from approved plans. No deviations shall <br /> be permitted without prior approval by City of Everett. <br /> 5. Contact the City of Everett Public Works Inspector Randy Allen at 425-339-7403 prior to starting construction to set up a pre- <br /> construction consultation.All inspections must be formally requested. See the attached handout for phone number and online instructions <br /> to Request an Inspection. <br /> 6. City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expense.T wd1`14 gbe <br /> under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimate by th►eWaterti% artmOit.VWbgk shall <br /> be scheduled 3-4 weeks in advance. <br /> 7.As-builts of storm, sanitary sewer, and water systems will be required to be submitted to the P sn pt griJes9n and <br /> Construction Standards and Specifications for Development prior to final approval/close out of therm ; <br /> 8. On-site water main will be staked within an easement to the City. The easement documentation will be sutitfid to thaj`ity prior to <br /> issuance of permits and must be recorded by the project team with a copy of the recorded documentjubmitted to the Citytior Wft.r.i.al <br /> approval/close out of the permit. !�' 'r <br /> 9. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvemen0shall be submitted to the Citx prior <br /> to final approval/close out of the permit. <br /> 10.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infras pt re shall be submitted to fig City <br /> prior to final approval/close out of the permit. m a , } a <br /> 11.A Landscape Inspection is required by the Planning Department prior to final by the Public Wd$�s InOw c f r1ct the PlanniiT <br /> Department at 425-257-2273 to schedule the inspection. LT1 e 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. ( l e5K5gstiari a to rewitit ;Final <br /> for this permit when all items have been completed. ,-- ""' <br /> Public Works Permit Fee Breakdown: � n <br /> Paving(102,000SF) $510.00 <br /> Erosion Cbntrol $200.00 JUL <br /> Grade/Fill/Excavate(33,000CY) $525.00 2018 <br /> PW Plan Review $5,688.53 <br /> PW Site Inspection $11,377.05 CITY • `, <br /> City of Everett Official Use Only ACKNOWLEN , 11ktretungrAoNs <br /> The undersigned owner/applicant ea eqg o hold and save <br /> Ii harmless the City of Everett from any and all claims for damages,costs, <br /> `i�' 4917g_s <br /> expenses,or causes of action that may arise because of installation and <br /> maintenance of the improvement or other right-of-way use here to applied <br /> Approved for Construction (Public Works) rther agrees to r m e same upon notice from the City and to <br /> replace public damage thereb <br /> FINAL INSPECTION Date if- <br /> Approved as Constructed (PW Inspector) Signature o Applicant Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO <br /> COMPLETEION.THIS PERMIT MAY BE CANCELLED BY THE CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 90-DAY DURATION. <br />