7erl-r4" • <br /> PUBLIC WORKS <br /> b. Please see all redlines on the attached plans for required corrections in addition to all <br /> comments listed below. Frequently, redlines will be stand-alone and will not have an <br /> associated item in this corrections letter.Likewise,comments below may not have associated <br /> redlines. Please indicate to the City that all redlines have been adequately addressed by <br /> providing checkmarks or notes next to the City's redlines to indicate that it has been picked <br /> up or to answer a reviewer's question. A comment response letter can also be included with <br /> your resubmittal to address the comments below(handwritten remarks under each comment <br /> on this letter are perfectly acceptable). The below listed sheets have redlines. <br /> i. Sheet C0.03 <br /> ii. Sheet C 1.01 <br /> iii. Sheet C1.02 <br /> iv. Sheet C2.01 <br /> v. Sheet C2.03 <br /> vi. Sheet C4.01 <br /> vii. Sheet C4.02 <br /> viii. Sheet R1.01 <br /> ix. Sheet R1.02 <br /> 2. The comments below were generated from this project's Stormwater Reviewer. If you have any <br /> questions regarding these comments, please contact Arnie Roshak (425-257-7249 or <br /> ARo shak@everettwa.go v). <br /> a. Replace Ex CB#01 with new type 1 catch basin—the existing structure is actually an inlet <br /> with no sump and is not to current City standards. <br /> b. Proposed 12-inch drain line is shown discharging to an existing 8-inch storm drain at Ex <br /> CB#01. There is an error in the survey. The existing pipe from ex CB#01 to the catch <br /> basin across the street is 6-inches,not 8-inches. (Confirmed in the field,there is a 6"PVC <br /> pipe in the outlet of Ex CB01) Confirm sizing needed to convey flows from the site and <br /> ROW(currently showing a 12-inch discharging to an 8-inch pipe). If a 12-inch is needed, <br /> replace drain line from ex CB#01 to the connection to CS main, otherwise,just replace <br /> and upsize the ex 6"pipe to 8"to the downstream catch basin across the street. <br /> c. Bioretntion cell #1 dimensions and bottom area in plans are smaller than what was used <br /> in the model input. Revise modeling calcs for the proposed design or make proposed <br /> design match model. <br /> d. Modeling input shows that bioretention cell #1 discharges to bioretention cell #2, but the <br /> plans show it discharging directly to Infiltration Facility 1. Revise modeling calcs for the <br /> proposed design or make the proposed design match the model. <br /> e. Confirm pervious areas for basin 3-7 (model input doesn't match the table in the <br /> Developed Basin Map). <br /> f. Provide all inputs and outputs from the model for review, not just snapshots. <br /> Page 2 of 3 <br />