My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4730 COLBY AVE YMCA 2021-03-31
>
Address Records
>
COLBY AVE
>
4730
>
YMCA
>
4730 COLBY AVE YMCA 2021-03-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2021 2:09:42 PM
Creation date
1/27/2021 10:47:46 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4730
Tenant Name
YMCA
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
552
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> Materials Testing & Consulting, Inc. ` <br /> Geotechnical Engineering&Consulting•Special Inspection•Materials Testing•Environmental Consulting -- a escara .-- <br /> New Everett Family YMCA - 188210 - IPD-Soil Compaction: Report #D203211 <br /> CLIENT YMCA of Snohomish County DATE 04/09/2019 <br /> PROJECT LOCATION 4750 Colby Avenue Everett WA PERMIT# <br /> Inspection Information: <br /> Inspection Date: Time Onsite: 5:30 Weather Some rain 50s <br /> 04/09/2019 AM Conditions: <br /> Inspection Performed: IPD-Soil Compaction <br /> Field Data: <br /> J ;604 Work/Location: ;SW curb/sidewalk subgrade Gauge Standard MS:� ._! <br /> Equipment ID&Serial#: ;Troxler 3430D,Ser.#19286 Gauge Standard DS: 1594 <br /> Test Samples: <br /> Sample#:Description:Proctor Value(pcf):Optimum Moisture and Oversize Rock Correction: <br /> 1.SB18-0684 125.4;Native SM <br /> _.._..._,..#�__ v !:OM@8.3%-_..v <br /> TEST METHOD ® ASTM D-1557/AASHTO T-180 <br /> In Place Density Test Results (ASTM D-6938): <br /> Test Mode 1 Location of Test Elev. Wet Dry Dens. Moist% Sample %Comp. %Regd. <br /> 1 E 8" 30'S of entrance FG E132,1 18 119.9 ? 10 2 I 1 _; ''_ 95.6 L 95 <br /> 2 -8"1_1[80'S of entrance — FG ;[ 132,4 'F 120.6 i7 9,8 1 i? 96.2 j 95 <br /> 3 rr 8" [110"S of entrance FG e1 132 11 119.7 10.3 1 i? 95.5 I' 95 <br /> ® Native Soils Soils consistent with Proctor O Yes 0 No <br /> ❑ Imported Fills Soils found to be firm and stable;and to the best of our knowledge,meet O Yes 0 No <br /> compaction <br /> Contractor notified of results O Yes 0 No <br /> Remarks: <br /> i <br /> MTC was on site as scheduled to perform in place density testing on undisturbed native per City of Everett's request. <br /> j Contractor informed MTC that soils were excavated down to planned subgrade and had already placed 2 inches of <br /> crushed rock on top which was compacted with a large plate compactor. Area tested today was the curb line and • <br /> sidewalk in the Southwest corner of the site from construction entrance to 48th Street SE. <br /> 1 <br /> 1 Some standing water remained from recent rains,contractor informed us he will pump out before placing concrete.All <br /> testing met or exceeded 95%compaction,contractor was notified prior to departure. <br /> To the best of MTC inspector's knowledge,the above-described work was performed in general accordance with project <br /> specifications and approved plans. <br /> Images: <br /> Corporate • 777 Chrysler Drive • Burlington, WA 98233 • Phone 360.755.1990 • Fax 360.755.1980 <br /> Regional Offices: Olympia Bellingham Silverdale Tukwila <br /> 360.534.9777 360.647.6111 360.698.6787 206.241.1974 <br /> Visit our website: www.mtc-inc.net <br /> New Everett Family YMCA-18B210,04/09/2019,#D203211,Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.