Laserfiche WebLink
f. Illegal turn -on, tampering of water service or illegal <br />connection (Plus cost of repairs) <br />Lien processing fee <br />h. New account setup charge <br />i. Locate and mark City water shut-off valve <br />j. Temporary shut-off/turn-on <br />k. Temporary shut-off/turn-on (Vault Entry) <br />I. Failure to return a city owned water service key <br />m. Returned check fee <br />n. Hang notice for delinquent account <br />o.. Illegal taking of water from a fire hydrant <br />p. Non-compliance with annual back -flow testing <br />q. Construction Meters <br />Deposit <br />Usage per CCF <br />Hydrant Permit <br />Deposit <br />Monthly fee based on projected usage <br />Low (0 to 30,000 gallons/month) <br />Medium (30,001 to 60,000 gallons/month) <br />High (over 60,000 gallons/month) <br />s. Dormant Inspection <br />t. Should a customer receive a "past due letter" for failure to <br />pay by the due date, a late fee equal to 5% of the payment <br />past due will be assessed on all amounts in arrears at the <br />time of each monthly billing <br />$230.00 <br />$160.00 <br />$40.00 <br />$70.00 <br />$70.00 <br />$140.00 <br />$100.00 <br />$35.00 <br />$40.00 <br />$1,100.00 <br />$55.00 per month <br />$2,500.00 <br />$4.74 per 100 cu. ft <br />$100.00 <br />$110.00 <br />$220.00 <br />$425.00 <br />$70.00 <br />