My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4730 COLBY AVE YMCA Geotech Report 2025-04-14
>
Address Records
>
COLBY AVE
>
4730
>
YMCA
>
Geotech Report
>
4730 COLBY AVE YMCA Geotech Report 2025-04-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 7:39:14 AM
Creation date
1/27/2021 4:21:10 PM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4730
Tenant Name
YMCA
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Subsurface Exploration, Geologic Hazard, and <br /> Snohomish County YMCA Geotechnical Engineering Report <br /> Everett, Washington Project and Site Conditions <br /> I. PROJECT AND SITE CONDITIONS <br /> 1.0 INTRODUCTION <br /> This report presents the results of our subsurface exploration, geologic hazard, and <br /> geotechnical engineering study for the construction of the new Snohomish County YMCA. The <br /> site location is shown on the "Vicinity Map," Figure 1, and approximate locations of the <br /> explorations completed by Associated Earth Sciences, Inc. (AESI) are shown on the "Site and <br /> Exploration Plan," Figure 2. We are familiar with the site through the completion of our <br /> Hydrogeology Report titled, "Stormwater Infiltration Assessment-YMCA of Snohomish <br /> County," dated January 17, 2018. For preparation of this report, we were provided with a 100% <br /> Design Development Plan Set, prepared by BCRA and dated January 25, 2018, and with a 100% <br /> Design Development Set Outline Specification - Everett YMCA, prepared by BCRA and dated <br /> January 25, 2018, which includes a previously completed geotechnical engineering study, <br /> prepared by Liu &Associates, Inc. and dated October 25, 2015. <br /> 1.1 Purpose and Scope <br /> The purpose of this study was to provide subsurface data to be utilized in the design and <br /> development of the referenced project. Our study included reviewing available geologic <br /> literature, reviewing previously completed explorations by AESI, reviewing explorations <br /> completed by others, and performing geologic studies to assess the type, thickness, <br /> distribution, and physical properties of the subsurface sediments and groundwater. <br /> Geotechnical engineering studies were completed to formulate recommendations for site <br /> preparation, grading, types of suitable foundations and floors, allowable foundation <br /> soil-bearing pressure, anticipated foundation and floor settlement, drainage considerations, <br /> and infiltration feasibility. This report summarizes our fieldwork and offers recommendations <br /> based on our present understanding of the project. <br /> 1.2 Authorization <br /> Our study was accomplished in general accordance with our scope of work and cost proposal, <br /> dated February 8, 2018. This report has been prepared for the exclusive use of YMCA of <br /> Snohomish County and their agents, for specific application to this project. Within the <br /> limitations of scope, schedule, and budget, our services have been performed in accordance <br /> with generally accepted geotechnical engineering and engineering geology practices in effect in <br /> this area at the time our report was prepared. No other warranty, express or implied, is made. <br /> February 26,2018 ASSOCIATED EARTH SCIENCES,INC. <br /> AWR/ms-170671E001-2-Projects120170671 lKElWP Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.