Laserfiche WebLink
• <br /> GRAPHITE Graphite Design Group <br /> 1809 7th Avenue,Suite 700 <br /> Seattle,WA 98101 <br /> 206.224.3335 <br /> www.graphiteclesigngroup.com <br /> � September 27,2019 <br /> To: Thad Newport <br /> Development Technician <br /> City of Everett <br /> Community,Planning&Economic Development <br /> 3200 Cedar Street 2nd Fl., <br /> Everett,WA 98201 VRe: Plan Review No: B1907-027D <br /> ED <br /> Public Works Response Letter OCr 0 , <br /> 2019 <br /> MOD Pizza-Evergreen Way CITY OF EVERETT <br /> Project Number: 19001.09 Permit Services <br /> Dear Thad Newport: <br /> Following are responses to the Public Works review comments,notification date September 27,2019 <br /> for the above-mentioned project: <br /> Planning Comments: <br /> PW1. 1. Please resubmit the following items to the Permit Services Counter with your resubmittal <br /> once all requested revisions have been made: <br /> a. Transmittal Sheet: (1) available at the Permit Counter(and included herein for your use <br /> upon resubmittal). <br /> b. Plans: (2)full size sets of revised plans. <br /> c.Drainage Report: (2) copies of revised report. <br /> d. SWPPP Report: (2)copies of revised SWPPP report. <br /> Response: <br /> a.Please see attached. <br /> b.(2)sets of Revision 1 drawings included in transmittal package. <br /> c.No longer required as we do not trigger the Ecology requirement. <br /> d.No longer required as we do not trigger the Ecology requirement. <br /> PW2. Please provide the square footage for the parking lot,patio and sidewalk areas being <br /> replaced. It appears that there is more than 2,000 SF of replaced hard surface area (asphalt and <br /> concrete) which triggers minimum requirements 1-5 of the Ecology Stormwater Management Manual <br /> of Western Washington (SWMMWW). More than 5,000 SF will trigger minimum requirements 1-9. <br /> Minimum Requirement 5 requires on-site stormwater management utilizing the BMPs shown in List <br /> #1 in order of priority. Before I can approve the building permits, I will need the required plans and <br /> reports addressing the Ecology requirements. If you have any questions,please feel free to email or <br /> call me. <br /> � I� <br />