My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY Geotech Report 2022-10-25
>
Address Records
>
EVERGREEN WAY
>
8417
>
Geotech Report
>
8417 EVERGREEN WAY Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:40:18 PM
Creation date
1/28/2021 8:42:46 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Geotechnical Engineering Report-Revised lierracon <br /> Proposed CFT Retail •Everett,Washington <br /> February 1, 2018 ■Terracon Project No. 81185002 <br /> excavation should be covered with crushed aggregate which is encompassed in Mirafi 140NL or <br /> approved equivalent which will aid in reducing fines from entering the storm system. <br /> 4.7.5 Pavement Maintenance <br /> The pavement sections provided in this report represent minimum recommended thicknesses. <br /> Therefore, preventive maintenance should be planned and provided for through an on-going <br /> pavement management program. Preventive maintenance activities are intended to slow the rate <br /> of pavement deterioration, and to preserve the pavement investment. Preventive maintenance <br /> consists of both localized maintenance (e.g., crack and joint sealing and patching) and global <br /> maintenance(e.g.,surface sealing). Prior to implementing any maintenance,additional engineering <br /> observation is recommended to determine the type and extent of preventive maintenance. Even <br /> with periodic maintenance, some movements and related cracking may still occur and repairs may <br /> be required. <br /> 5.0 GENERAL COMMENTS <br /> Terracon should be retained to review the final design plans and specifications so comments can <br /> be made regarding interpretation and implementation of our geotechnical recommendations in the <br /> design and specifications. Terracon also should be retained to provide observation and testing <br /> services during grading, excavation,foundation construction and other earth-related construction <br /> phases of the project. <br /> The analysis and recommendations presented in this report are based upon the data obtained <br /> from the borings performed at the indicated locations and from other information discussed in this <br /> report. This report does not reflect variations that may occur between borings, across the site, or <br /> due to the modifying effects of construction or weather. The nature and extent of such variations <br /> may not become evident until during or after construction. If variations appear, we should be <br /> immediately notified so that further evaluation and supplemental recommendations can be <br /> provided. <br /> The scope of services for this project does not include either specifically or by implication any <br /> environmental or biological (e.g., mold, fungi, bacteria) assessment of the site or identification or <br /> prevention of pollutants, hazardous materials or conditions. If the owner is concerned about the <br /> potential for such contamination or pollution, other studies should be undertaken. <br /> This report has been prepared for the exclusive use of CFT Retail and C. Shen for specific <br /> application to the project discussed and has been prepared in accordance with generally accepted <br /> geotechnical engineering practices. No warranties, either express or implied, are intended or <br /> made. Site safety, excavation support, and dewatering requirements are the responsibility of <br /> others. In the event that changes in the nature, design, or location of the project as outlined in this <br /> report are planned, the conclusions and recommendations contained in this report shall not be <br /> Responsive • Resourceful ■ Reliable 20 <br />
The URL can be used to link to this page
Your browser does not support the video tag.