My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY Geotech Report 2022-10-25
>
Address Records
>
EVERGREEN WAY
>
8417
>
Geotech Report
>
8417 EVERGREEN WAY Geotech Report 2022-10-25
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:40:18 PM
Creation date
1/28/2021 8:42:46 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Address Document Type
Geotech Report
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BORING LOG NO. B-8 Page 1 of 1 <br /> PROJECT: CFT Retail Everett,WA CLIENT: CFT NV Developments LLC <br /> Rosemead, CA <br /> SITE: 8417b Evergreen Way <br /> Everett,WA <br /> O• LOCATION See Exhibit A-2 w z in 0 ` F a z <br /> -r v >0 r CD CO tr <br /> U Latitude:47.9208°Longitude:-122.2288° -j Q ~ HH a ILwro W Z i- <br /> a > ❑� gg aw z <br /> Approximate Surface Elev:561(Ft.)+/- o m Q w " a¢�z 00 w <br /> DEPTH ELEVATION(Ft.) <br /> o o- <br /> ' A PHALT,3 1/2-inch layer of asphalt /56n 5+/- <br /> • ® SILTY SAND WITH GRAVEL(SMI,coarse to medium grained,dark — <br /> �� brown,loose,moist <br /> 4.%4® (FILL) <br /> m .0• _ 2-X <br /> 7 N=2= S-1 <br /> o �4= • <br /> w �:® <br /> ♦1 <br /> '' 5— <br /> • x� 14 1 3-4 <br /> ♦4S-2 <br /> H Oi - N=7 <br /> *4. e6.5 J ight gray 55 4_5+/- <br /> Zi Boring Terminated at 6.5 Feet <br /> 0 <br /> uJ <br /> w <br /> a. <br /> a <br /> I- <br /> w <br /> U <br /> w <br /> w <br /> U- <br /> 0 <br /> U <br /> N <br /> 0 <br /> 0 <br /> co <br /> �>JJ <br /> 0 <br /> Z <br /> t <br /> 8 <br /> J <br /> a <br /> 0 <br /> w <br /> 0 <br /> 0 <br /> w <br /> a: <br /> Z <br /> E <br /> 0 <br /> 0 <br /> L <br /> LL <br /> 0 <br /> w <br /> Stratification lines are approximate.In-situ,the transition may be gradual. Hammer Type: Automatic <br /> o: <br /> w <br /> w <br /> LL Advancement Method: See Exhibit A-3 for description of field Notes: <br /> 4 1/4"Hollow Stem Auger procedures. <br /> See Appendix B for description of laboratory <br /> procedures and additional data(if any). <br /> O Abandonment Method: See Appendix C for explanation of symbols and <br /> Boring backfilled with Auger Cuttings and/or Bentonite abbreviations. <br /> Surface Capped with Asphalt <br /> 0 <br /> WATER LEVEL OBSERVATIONS <br /> 0 Boring Started:01-10-2018 Boring Completed:01-10-2018 <br /> 1rracori <br /> coDrill Rig:Model B 61 Driller:Environmental Drilling,Inc_ <br /> 21905 64th Ave W Ste 100 <br /> Mountlake Terrace,WA Project No.:81185002 Exhibit: A-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.