My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY 2022-05-23
>
Address Records
>
EVERGREEN WAY
>
8417
>
8417 EVERGREEN WAY 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:28:37 AM
Creation date
1/28/2021 9:01:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
pARTNIR <br /> Engineering and Science, Inc: <br /> June 26th, 2019 <br /> Paul McKee <br /> Permit Services Manager, City of Everett <br /> (425)257-8867 <br /> Subject: RE: Building Permit #B1805-010 <br /> Dear Paul, <br /> Thank you for the detailed plan review check. We have revised the plans and reports per the City of <br /> Everett's comments and are issuing these revised set of plans for your review. The following changes <br /> were made as part of this plan submittal: <br /> 1. On C-100,the legal description was compared to the original documentation and was revised to <br /> properly reflect the true description <br /> 2. Across all sheets, construction note 32 was revised to a 1"water meter <br /> 3. Across all sheets, construction notes 41 and 42 were removed. 41 was replaced with the <br /> requested root barrier. <br /> 4. C-200 was revised to show a relocated Bioretention Swale "A" <br /> 5. C-200 was revised to show the PCC pavement in locations where the Stormtech system had less <br /> than 18"of cover. <br /> 6. C-200 was revised to show the root barriers <br /> 7. C-200 was revised to show the second stormtech inspection port <br /> 8. C-300 was revised for the removal of the grease interceptor system <br /> 9. C-300 was revised to show the new Biofilter A dimensions, it should be noted that the original <br /> biofilter was 150 sqft in size,this Biofilter is functionally equivalent at the same size. <br /> 10. C-300 was revised to show two isolator rows <br /> 11. On C-301,the Nyloplast Drain Basin detail was revised for a 24"sump <br /> 12. On C-500,the Grease Interceptor detail was removed <br /> 13. On C-600, callout 36 was clarified <br /> 14. On C-600,.two isolator rows are now shown. <br /> Sincerely, <br /> Kyle Sherman, PE, ENV SP <br /> Project Engineer <br /> PARTNER ENGINEERING AND SCIENCE,INC. <br /> 1761 E.Garry Avenue, Santa Ana, CA 92705 <br /> C: 518-308-8501 10:800-419-4923 I D: 714-415-5848 <br /> 1761 E. Garry Avenue,Santa Ana,CA 92705 0 Phone 800-419-4923 0 Fax 949-231-5185 <br />
The URL can be used to link to this page
Your browser does not support the video tag.