Laserfiche WebLink
3/11/2020 City of Everett Page <br /> 4 <br /> 10:57:26An .-' <br /> INSPECTION ACTIVITY REPORT <br /> 1/31/2020 1/31/2020 BLDG 12-CEILING KMK APPROVAL as noted Mike:602-881-3879 <br /> GRID <br /> (1/31/2020 8:04 AM KMK) <br /> Obtain all rough-in inspection approvals for <br /> plumbing,mechanical,electrical,and fire <br /> before cover. <br /> (1/31/2020 3:22 PM KMK) <br /> Complete all other rough-in inspections <br /> before cover,to include fire,electrical, <br /> plumbing and mechanical. <br /> 2/27/2020 2/27/2020 FIRE 03-OTHER SAG CORRECTION (2/27/2020 2:57 PM SAG) <br /> For final need fire lanes and signage on <br /> riser room <br /> 3/4/2020 3/4/2020 TEMP KMK CORRECTION See notes (3/4/2020 8:22 AM KMK) <br /> CERTIFICATE OF 1.Obtain finals or'ok for tco"from all <br /> departments to include Public Works, <br /> Planning,Fire,and Electrical. <br /> 3/4/2020 3/4/2020 BLDG 15-FINAL KMK CORRECTION see notes (3/4/2020 8:26 AM KMK) <br /> 1.Complete all previous corrections <br /> 2.Seal around penetrations at demising <br /> wall <br /> 3.provide truss specs <br /> 3/6/2020 3/6/2020 FIRE 02-FINAL BRA APPROVAL Early PM Inspection requested <br /> (3/5/2020 3:31 PM SAG) <br /> 602-881-3879 <br /> Morning inspection requested.Ran out of <br /> time Thursday <br /> Knox box keys and check fire lane striping <br /> then final <br /> 3/9/2020 3/9/2020 PLANNING GEP APPROVAL final okay <br /> LANDSCAPING <br /> 3/10/2020 3/10/2020 BLDG 15-FINAL BDGI APPRVD-PERE <br /> 3/10/2020 3/10/2020 ADMIN USE KLC APPROVAL <br /> ONLY** <br /> 3/11/2020 3/11/2020 ADMEN'OTHER KLC APPROVAL Certificate of <br /> Completion <br /> INSP12 <br />