Laserfiche WebLink
PUBLIONORKS PERMIT • Date Applied: 5/8/2018 <br /> City of Everett Permit Services Public Works Permit#: PW1805-015 <br /> E V E R E T T 3200 Cedar Street, 2nd Floor Everett, WA 98201 Associated Bldg Permit#: B1805-014 <br /> Planning Reference#: REVI18-007 <br /> WASHINGTON 425-257-8810 Public Works Fee: $11,031.92 <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS:n 8 AIJ6 2019 <br /> CFT NV DEVELOPMENTS LLC MCILVAIN MARK <br /> 1683 WALNUT GROVE AVE <br /> ROSEMEAD,CA,91770 , <br /> PHONE: PHONE:9164511500 <br /> TAX PARCEL ID#: 28041300104900 SITE ADDRESS:8417 EVERGREEN WAY <br /> DESCRIPTION:CONST OF A NEW COMMERCIAL MULTI USE BUILDING <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> PERMIT CONDITIONS: <br /> 1. All calls for inspection shall be made 24 hours in advance. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans,SWPPP,and drainage report approved by the City of Everett Public Works Department. <br /> Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally <br /> request all required inspections. Flyers are provided at permit issuance with instructions on how to request an inspection online. <br /> 6.City of Everett Water Department crews shall make all connections to City water main at owner/contractor's expen4 Thik to <br /> be under a separate Utility Permit to be purchased at the Permit Services Counter per a cost estimatl?-bgtP Maker Dek rtnceht.Work <br /> shall be scheduled 3-4 weeks in advance. I* ?r''_, <br /> 7.As-builts of storm,sanitary sewer,and water systems will be required to be submitted to thAW Igchipity pesign and <br /> Construction Standards and Specifications for Development prior to final approval/close out of 'ie <br /> 8. A 1-year Warranty Bond in the amount of 10%of the construction costs for all public improvennts shall be submitd toity <br /> prior to final approval/close out of the permit. F:1 <br /> 9.A 2-year Warranty Bond in the amount of 10%of the construction costs for all Stormwater Infrtructure shall be submitted tithe <br /> City prior to final approval/close out of the permit. <br /> 10.A Landscape Inspection is required by the Planning Department prior to final by the Public 4i•Osinctor.Schedule the exading <br /> Planning Landscape inspection under"My Active Inspections"in your dashboard on the Online PB:r,mii'ri <br /> 11.This permit must be finaled in order to close out this permit/grant a Certificate of Occupant `R r t'aiTh 1 bpection onlirge by <br /> selecting PW 24-Site Final within the Online Permitting Portal Inspection Requests when all iten lWb ea i fti'eted for- IA§rmit. <br /> Public Works Permit Fee Breakdown: Uri <br /> Paving(26,848SF) $134.24 <br /> Erosion Control $200.00 <br /> Grade/Fill/Excavate(3965CY) $275.00 <br /> PW Plan Review $3474.23 <br /> PW Site Inspection $6948.45 <br /> City of Everett Official Use Only ACKNOWLEDGEMENT OF CONDITIONS <br /> The undersigned owner/applicant hereby agrees to hold and save harmless <br /> COLL :gig[$� the City of Everett from any and all claims for damages,costs,expenses,or <br /> July 24, 'tlJ ! ✓ causes of action that may arise because of installation and maintenance of <br /> Approved for Constru ion(Public Works) Date the improvement or other right-of-way use here to applied for and further <br /> agrees to rem n tice from the City and to replace public <br /> p er y y. <br /> (a(2) <br /> FINAL INSPECTION Date <br /> Approved as Constructed(PW Inspector) Signature of Appilican Date <br /> WORK AUTHORIZED BY THIS PERMIT MUST BE STARTED WITHIN 180 DAYS OF DATE PERMIT IS ISSUED AND THEREAFTER IS TO BE DILIGENTLY PURSUED TO COMPLETION.THIS PERMIT MAY BE CANCELLED BY THE <br /> CITY UPON ANY STOPPAGE OF WORK ON THIS PROJECT OVER 180-DAY DURATION.EACH INSPECTION EXTENDS THE EXPIRATION DATE 18P.DAYS TO K THE PERMIT OPEN WHILE WORK IS ACTIVE. <br /> -IL <br />