My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8417 EVERGREEN WAY 2022-05-23
>
Address Records
>
EVERGREEN WAY
>
8417
>
8417 EVERGREEN WAY 2022-05-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2022 7:28:37 AM
Creation date
1/28/2021 9:01:05 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8417
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
132
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 40 <br /> CFT Development <br /> Name of Project <br /> EV ETT 8417 Evergreen Way,Everett,WA 98208 <br /> Construction Site Address: <br /> B1805-010 / 1805—©t5 <br /> Permit Reference: <br /> ASSIGNMENT OF FUNDS TO THE CITY OF EVERETT <br /> For: (describe improvements) <br /> CFT NV Development,LLC Multi Tenant Building <br /> Improvements to be installed.per City standards by November 2019 <br /> We hereby agree that the sum of Thirty Thousand Nine Hundred- Seventy Two Dollars <br /> 30,972 Bank <br /> ($ ) will be held in Cserow Account No. 1800058 in <br /> Preferred Bank (hereinafter referred to as "Bank") whose address is <br /> 601 S Figueroa St,47th Floor,Los Angeles, CA 90017 in the name of <br /> CFT NV Developments,LLC to assure performance of the <br /> above-described improvements and guarantee that these funds will not be released without prior <br /> written approval from the City of Everett Public Works Department(hereinafter referred to as <br /> "City"). We agree that upon completion of the installation of the above-described improvements <br /> per City standards and approval by the City,the City will provide written notice to the Bank <br /> authorizing the release of these funds. We further agree that these funds will be released to the <br /> City upon notice by the City that the improvements have not been installed per City standards. <br /> Provided further, however, that in the event the above-described improvements are installed per <br /> I <br /> City standards and a certificate of partial compliance is signed by the City,then in that event,we <br /> are further instructed to release progress payments for the amount of improvements installed per <br /> City standard and approved by the City. The City shall have first claim and priority to the <br /> remaining balance of said sum of Thirty Thousand Nine Hundred- Seventy Two Dollars <br /> Assignment of Funds,Page 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.