My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021-01-28
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2021-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 3:48:13 PM
Creation date
1/28/2021 3:37:54 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
649
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> I • Whenever possible,the entrance shall be constructed on a firm, <br /> > <br /> compacted subgrade. This can substantially increase the effectiveness <br /> Iof the pad and reduce the need for maintenance. <br /> Maintenance • Quarry spalls (or hog fuel) shall be added if the pad is no longer in <br /> I Standards accordance with the specifications. <br /> • If the entrance is not preventing sediment from being tracked onto <br /> pavement, then alternative measures to keep the streets free of <br /> I sediment shall be used. This may include street sweeping, an increase <br /> in the dimensions of the entrance, or the installation of a wheel wash. <br /> • Any sediment that is tracked onto pavement shall be removed by <br /> I shoveling or street sweeping. The sediment collected by sweeping <br /> shall be removed or stabilized on site. The pavement shall not be <br /> cleaned by washing down the street, except when sweeping is <br /> I ineffective and there is a threat to public safety. If it is necessary to <br /> wash the streets, the construction of a small sump shall be considered. <br /> The sediment would then be washed into the sump where it can be <br /> Icontrolled. <br /> • Any quarry spalls that are loosened from the pad, which end up on the <br /> I roadway shall be removed immediately. <br /> • If vehicles are entering or exiting the site at points other than the <br /> construction entrance(s), fencing (see BMPs C 103 and C 104) shall be <br /> I installed to control traffic. <br /> • Upon project completion and site stabilization, all construction <br /> accesses intended as permanent access for maintenance shall be <br /> Ipermanently stabilized. <br /> I Driveway shall meet the <br /> requirements of the <br /> permitting agency <br /> It is recommended that <br /> • the entrance be <br /> I crowned so that runoff <br /> oad drains off the pad <br /> ��si��9P <br /> i >.1:zlitt^-` <br /> Install driveway culvert '‘'`‘4i41b 4;e�.,; <br /> if there is a roadside Yam,r•<.,Z,N <br /> I \_ <br /> ditch present �•,=��� =� <br /> 4"-8"quarry spalls a <br /> Geotextile •; •;%:J;'- <br /> 12"min.thickness—3— l\ <br /> Provide full width of <br /> ingress/egress area <br /> I <br /> Figure 4.2-Stabilized Construction Entrance <br /> 1 <br /> IFebruary 2005 Volume ll- Construction Stormwater Pollution Prevention 4-9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.