Laserfiche WebLink
I <br /> I <br /> • After adequate <br /> e dequa e cover is achieved, any areas that experience erosion <br /> I shall be reseeded and protected by mulch. If the erosion problem is <br /> drainage related, the problem shall be fixed and the eroded area <br /> reseeded and protected by mulch. <br /> • Seeded areas shall be supplied with adequate moisture,but not watered <br /> to the extent that it causes runoff. <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> IFebruary 2005 Volume ll- Construction Stormwater Pollution Prevention 4-19 <br />