Laserfiche WebLink
I <br /> Stormwater Pollution Prevention Plan <br /> • Section 3 —CONSTRUCTION BMPs. This section provides a detailed description of the <br /> BMPs to be implemented based on the 12 required elements of the SWPPP (SWMMWW <br /> 2005). <br /> • Section 4—CONSTRUCTION PHASING AND BMP IMPLEMENTATION. This <br /> section provides a description of the timing of the BMP implementation in relation to the <br /> project schedule. <br /> • Section 5 —POLUTION PREVENTION TEAM. This section identifies the appropriate <br /> contact names (emergency and non-emergency), monitoring personnel, and the onsite <br /> temporary erosion and sedimentation control inspector. <br /> • Section 6—INSPECTION AND MONITORING. This section provides a description of <br /> the inspection and monitoring requirements such as the parameters of concern to be <br /> monitored, sample locations, sample frequencies, and sampling methods for all <br /> Stormwater discharge locations from the site. <br /> • Section 7—RECORDKEEPING. This section describes the requirements for <br /> documentation of the BMP implementation, site inspections, monitoring results, and <br /> changes to the implementation of certain BMPs due to site factors experienced during <br /> construction. <br /> Supporting documentation and standard forms are provided in the following Appendices: <br /> Appendix A: Civil Plan Set(Reduced Size) <br /> Appendix B: General Permit(Notice of Intent) <br /> Appendix C: NOI and EPA Authorization <br /> Appendix D: Site Inspection Forms <br /> Appendix E: Corrective Action Form <br /> Appendix F: SWPPP Amendment Log <br /> Appendix G: Subcontractor Certifications/Agreements <br /> Appendix H: Grading and Stabilization Log <br /> Appendix I: SWPPP Training Log <br /> 111 Appendix J: Delegation of Authority <br /> Appendix K: Best Management Practices (BMP's) <br /> Appendix L: Engineering Calculations <br /> 1 <br /> I <br /> 2 <br />