My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021-01-28
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2021-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 3:48:13 PM
Creation date
1/28/2021 3:37:54 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
649
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Stormwater Pollution Prevention Plan <br /> • <br /> Temporary and Permanent Seeding (BMP C120) <br /> ■ Mulching (BMP C 121) <br /> ■ Plastic Covering(BMP C123) <br /> • Sodding (BMP C124) <br /> ■ Dust Control (BMP C140) <br /> • Post-Construction Soil Quality and Depth(BMP T5.13) <br /> 3.1.6 Element#6—Protect Slopes <br /> All cut and fill slopes will be designed, constructed, and protected in a manner that minimizes <br /> erosion. The following specific BMPs will be used to protect slopes for this project: <br /> ■ Temporary and Permanent Seeding(BMP C l20) <br /> 3.1.7 Element#7—Protect Drain Inlets <br /> All downstream storm drain inlets shall be protected to prevent sediment-laden drainage from <br /> entering the storm drainage conveyance system. See sheets C2.01-C2.02, C2.03, and C2.31 of <br /> the civil plans for locations of Filter Fabric Protection for CB's (Storm Drain Inlet Protection). <br /> However, the first priority is to keep all access roads clean of sediment and keep street wash <br /> water separate from entering storm drains until treatment can be provided. <br /> • Storm Drain Inlet Protection(BMP C220) <br /> 3.1.8 Element#8—Stabilize Channels and Outlets <br /> Outlets discharging to open channels will have necessary outfall protection installed to prevent <br /> scour and erosion. Rock check dams will be installed as necessary. The following BMP's will <br /> be used to stabilize channels and outlets: <br /> I . Interceptor Dike and Swale (BMPC200) <br /> • Outlet Protection(BMP C209) <br /> 3.1.9 Element#9—Control Pollutants <br /> All pollutants, including waste materials and demolition debris, that occur onsite shall be <br /> handled and disposed of in a manner that does not cause contamination of storm water. Good <br /> housekeeping and preventative measures will be taken to ensure that the site will be kept clean, <br /> well organized, and free of debris. If required, BMPs to be implemented to control specific <br /> sources of pollutants are discussed below. <br /> Vehicles, construction equipment, and/or petroleum product storage/dis <br /> pensing: <br /> I <br /> I <br /> I <br />
The URL can be used to link to this page
Your browser does not support the video tag.