Laserfiche WebLink
I <br /> Stormwater Pollution Prevention Plan <br /> • Based on the information provided and/or local weather conditions, the <br /> local permitting authority may expand or restrict the seasonal limitation on <br /> site disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading <br /> limitations: <br /> ❑ Routine maintenance and necessary repair of erosion and sediment <br /> control BMPs; <br /> ❑ Routine maintenance of public facilities or existing utility <br /> structures that do not expose the soil or result in the removal of the <br /> vegetative cover to soil; and <br /> ❑ Activities where there is 100 percent infiltration of surface water <br /> runoff within the site in approved and installed erosion and <br /> sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> I . Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected,maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall <br /> be conducted by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. This person has the necessary <br /> skills to: <br /> ❑ Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call <br /> 111 at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> I <br /> I11 <br />