My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021-01-28
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2021-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 3:48:13 PM
Creation date
1/28/2021 3:37:54 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
649
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> Stormwater Pollution Prevention Plan <br /> • Based on the information provided and/or local weather conditions, the <br /> local permitting authority may expand or restrict the seasonal limitation on <br /> site disturbance. <br /> • The following activities are exempt from the seasonal clearing and grading <br /> limitations: <br /> ❑ Routine maintenance and necessary repair of erosion and sediment <br /> control BMPs; <br /> ❑ Routine maintenance of public facilities or existing utility <br /> structures that do not expose the soil or result in the removal of the <br /> vegetative cover to soil; and <br /> ❑ Activities where there is 100 percent infiltration of surface water <br /> runoff within the site in approved and installed erosion and <br /> sediment control facilities. <br /> Coordination with Utilities and Other Jurisdictions <br /> I . Care has been taken to coordinate with utilities, other construction <br /> projects, and the local jurisdiction in preparing this SWPPP and <br /> scheduling the construction work. <br /> Inspection and Monitoring <br /> • All BMPs shall be inspected,maintained, and repaired as needed to assure <br /> continued performance of their intended function. Site inspections shall <br /> be conducted by a person who is knowledgeable in the principles and <br /> practices of erosion and sediment control. This person has the necessary <br /> skills to: <br /> ❑ Assess the site conditions and construction activities that could <br /> impact the quality of stormwater, and <br /> ❑ Assess the effectiveness of erosion and sediment control measures <br /> used to control the quality of stormwater discharges. <br /> • A Certified Erosion and Sediment Control Lead shall be on-site or on-call <br /> 111 at all times. <br /> • Whenever inspection and/or monitoring reveals that the BMPs identified <br /> in this SWPPP are inadequate, due to the actual discharge of or potential <br /> to discharge a significant amount of any pollutant, appropriate BMPs or <br /> design changes shall be implemented as soon as possible. <br /> Maintaining an Updated Construction SWPPP <br /> I <br /> I11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.