Laserfiche WebLink
i <br /> Stormwater Pollution Prevention Plan <br /> 6.0 Site Inspections and Monitoring <br /> g <br /> Monitoring includes visual inspection, monitoring for water quality parameters of concern, and <br /> documentation of the inspection and monitoring findings in a site log book. A site log book will <br /> be maintained for all on-site construction activities and will include: <br /> ■ A record of the implementation of the SWPPP and other permit • <br /> requirements; <br /> ■ Site inspections; and, <br /> I . Stormwater quality monitoring. <br /> For convenience, the inspection form and water quality monitoring forms included in this <br /> SWPPP include the required information for the site log book. This SWPPP may function as the <br /> site log book if desired, or the forms may be separated and included in a separate site log book. <br /> However, if separated, the site log book but must be maintained on-site or within reasonable <br /> access to the site and be made available upon request to Ecology or the local jurisdiction. <br /> 6.1 Site Inspection <br /> All BMPs will be inspected, maintained, and repaired as needed to assure continued performance <br /> p p <br /> of their intended function. The inspector will be a Certified Erosion and Sediment Control Lead <br /> (CESCL)per BMP C160. The name and contact information for the CESCL is provided in <br /> Section 5 of this SWPPP. <br /> Site inspection will occur in all areas disturbed by construction activities and at all stormwater <br /> discharge points. Stormwater will be examined for the presence of suspended sediment, <br /> turbidity, discoloration, and oily sheen. The site inspector will evaluate and document the <br /> effectiveness of the installed BMPs and determine if it is necessary to repair or replace any of the <br /> BMPs to improve the quality of stormwater discharges. All maintenance and repairs will be <br /> documented in the site log book or forms provided in this document. All new BMPs or design <br /> changes will be documented in the SWPPP as soon as possible. <br /> ' 6.1.1 Site Inspection Frequency <br /> Site inspections will be conducted at least once a week and within 24 hours following any <br /> rainfall event which causes a discharge of stormwater from the site. For sites with temporary <br /> stabilization measures,the site inspection frequency can be reduced to once every month. Storm <br /> water inspections will continue and be thoroughly documented until the Notice of Termination <br /> (NOT) is filed and acknowledged by the EPA. <br /> 6.1.2 Site Inspection Documentation <br /> The site inspector will record each site inspection using the site log inspection forms provided in <br /> Appendix C. The site inspection log forms may be separated from this SWPPP document,but <br /> will be maintained on-site or within reasonable access to the site and be made available upon <br /> request to the Department of Ecology. <br /> 16 <br />