My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2021-01-28
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2021-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2021 3:48:13 PM
Creation date
1/28/2021 3:37:54 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
649
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> ISection A-Initial Report(CGP Part 5.4.1) <br /> (Complete this section within 24 hours of discovering the condition that triggered corrective action) <br /> IName of Project CGP Tracking No. Today's Date <br /> Date Problem First Discovered Time Problem First Discovered <br /> Name and Contact Information of <br /> IIndividual Completing this Form <br /> What site conditions triggered the requirement to conduct corrective action (check the box that applies): <br /> ❑ A required stormwater control was never installed,was installed incorrectly, or not in accordance with the <br /> I requirements in Part 2 and/or 3 <br /> ❑ The stormwater controls that have been installed and maintained are not effective enough for the discharge to meet <br /> applicable water quality standards or applicable requirements in Part 3.1 of the permit <br /> ❑ A Part 2.3.1 prohibited discharge has occurred or is occurring <br /> I ❑ EPA requires corrective action as a result of permit violations found during an EPA inspection carried out under Part 4.2 <br /> Provide a description of the problem: <br /> 1 <br /> Deadline for completing corrective action (Enter date that is either: (1) no more than 7 calendar days after the date you <br /> Idiscovered the problem, or(2) if it is infeasible to complete work within the first 7 days, enter the date that is as soon as <br /> practicable following the 7th day): <br /> If your estimated date of completion falls after the 7-day deadline, explain(1)why you believe it is infeasible to complete <br /> I work within 7 days,and (2)why the date you have established for making the new or modified stormwater control <br /> operational is the soonest practicable timeframe: <br /> ISection B-Corrective Action Progress (CGP Part 5.4.2) <br /> (Complete this section no later than 7 calendar days after discovering the condition that triggered corrective action) <br /> JSection B.1 -Why the Problem Occurred <br /> Cause(s)of Problem How This Was Determined and the Date You Determined <br /> (Add an additional sheet if necessary) _ the Cause _ <br /> 11. 1 <br /> I 2. 2. <br /> ISection B.2-Stormwater Control Modifications to be Implemented to Correct the Problem <br /> List of Stormwater Control Modification(s) Date of SWPPP Update Notes <br /> INeeded to Correct Problem Completion Necessary? <br /> (Add an additional sheet if necessary) <br /> 1. ❑Yes ❑No <br /> If yes, provide date <br /> ISWPPP modified: <br /> 2. ❑Yes ❑No <br /> 1 If yes, provide date <br /> SWPPP modified: <br /> I <br /> Page 1 of 2 <br /> II <br />
The URL can be used to link to this page
Your browser does not support the video tag.