Laserfiche WebLink
• • <br /> PRIVATE WORK <br /> - <br /> Item Unit Quantity i Unit Price i' Amount 1 <br /> Storm Sewers <br /> 4- 6 Inch Pipe L.F. 349 20.00 6,980 I <br /> 8 Inch Pipe L.F. 1261 25.00 31 ,525 <br /> 12 Inch Pipe L.F. 1468 35.00 51,380 <br /> Yard Basin Ea. 200.00 <br /> Standard Catch Basin Ea. 13 700.00 9,100 <br /> Extra Depth Excavation, Ft./L.F. 5.00 <br /> (Over 12'deep) <br /> 48 Inch MH/CB Type II Ea. 3 1,800.00 5,400 <br /> ' 54 Inch MH/CB Type II Ea. 2 2,700.00 5,400 <br /> Extra Depth MH/CB, Ft. 110.00 <br /> (4 j inch per ft. over 12`) <br /> Extra Depth MH/CB, Ft. 140.00 <br /> (54 inch per ft. over 12') <br /> Restrictor/Pollution Control, Ea. 1,000.00 <br /> (12 Inch Larger - — --- -- _ — <br /> Storm Water Vault Ea. <br /> Water Quality Vault Ea. 1 50,000 50,000 <br /> Other 15" pipe 1029 42.50 43,732.50 <br /> Storm Sewers Total: $ 203,517.50 <br /> /� <br /> COST EST FEE CALC-2018 <br />