Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 4 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> Progress Schedule: A schedule prepared and maintained by Contractor, describing the sequence and <br /> duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract <br /> Time. <br /> Project: The undertaking to be performed under the provisions of the Contract. <br /> Punch List: List of incomplete items of Work and of items of Work that are not in conformance with the <br /> Contract Documents,prepared after Substantial Completion. <br /> RCW: Means the Revised Code of Washington. <br /> Samples: Physical examples of materials,Equipment, or workmanship that are representative of some <br /> portion of the Work and which establish the standards by which such portion of the Work will be judged. <br /> Schedule of Values: Allocation of Contract Sum to items of Work as provided in 9.1.1. Schedule of <br /> Values. <br /> Shall: Required conduct. <br /> Shop Drawings: All drawings,diagrams, illustrations, schedules, and other data or information,which <br /> are specifically prepared or assembled by or for Contractor and submitted by Contractor,to illustrate <br /> some portion of the Work. <br /> Shown: Refers to information presented on the Drawings,with or without reference to the Drawings. <br /> Site: Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the <br /> Work is to be performed, including rights-of-way and easements for access thereto, and such other lands <br /> furnished by Owner that are designated for the use of Contractor. <br /> Specifications: That part of the Contract Documents consisting of written descriptions of the technical <br /> features of materials,Equipment, construction systems, standards, and workmanship. <br /> Specify: Refers to information described, shown,noted or presented in any manner in any part of the <br /> Contract Documents. <br /> Subcontractor: An individual or entity having a direct contract with Contractor or with any other <br /> Subcontractor for the performance of a part of the Work. <br /> Submittals: The information required by the Contract Documents provided by Contractor to the <br /> Owner's Representative or Owner. <br /> Substantial Completion: The day on which the Owner or Owner's Representative determines the <br /> Owner has full and unrestricted use and benefit of the Project, from both the operational and safety <br /> standpoints and only minor incidental Work,replacement of temporary substitute facilities, or minor <br /> correction or repair Work remains. Determination of Substantial Completion in whole or in part is solely <br /> at the discretion of the Owner. Substantial Completion does not mean complete in accordance with the <br /> Contract nor shall Substantial Completion of all or any part of the Project entitle the Contractor to Final <br /> Acceptance under the Contract. <br /> Supplier: A manufacturer, fabricator, supplier, distributor,materialman, or vendor having a direct <br /> contract with Contractor or with any Subcontractor to furnish materials or Equipment to be incorporated <br /> in the Work. <br /> Total Float: The amount of time any given activity or path of activities may be delayed before it will <br /> affect the Completion Date. <br /> Total Solids (%TS): The total solids expressed as a percent of the dry mass of a sample as compared to <br /> the total sample mass. Total solids is further defined in Standard Method SM 2540 G. <br /> Traffic: Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists,wheelchairs, and <br /> equestrian traffic. <br /> 00 7200 - 4 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.