My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 8 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> on service connections shall be performed in a manner satisfactory to the service connection owner. The <br /> service connection owner has the option of doing such work with its own force at the Contractor's <br /> expense, or permitting the work to be performed by the Contractor. <br /> 2.3.3.4 Unknown Utilities <br /> When a utility interferes with the Work and is either(1)not identified on the Drawings or(2) located in a <br /> position significantly different from that specified on the Drawings, Contractor shall follow the <br /> procedures of ARTICLE 11.DIFFERING SITE CONDITIONS. Interference with the Work is <br /> defined as a utility that crosses or projects into the plane of the Work at an elevation between the top and <br /> bottom of the Work. If it is necessary to remove,relocate, or temporarily maintain the utility, that work <br /> shall be included in a Change Order. The utility owner has the option of doing such work or permitting <br /> the work to be performed by the Contractor. In either case, the cost of the work incurred by or charged to <br /> the Contractor will be included in a Change Order. <br /> 2.4. SUBMITTALS <br /> Where required by the Contract Documents, the Contractor shall submit information which will enable <br /> the Owner's Representative to advise the Owner whether the Contractor's proposed materials, Equipment <br /> or methods of work are in general conformance to the design concept and in compliance with the <br /> Drawings and Specifications, such as catalog cuts and shop,working or detail drawings. In its <br /> Submittals,the Contractor shall expressly and explicitly notify the Owner's Representative of any and all <br /> deviations from the Specifications. Without express and explicit Notice of a deviation from the Contract <br /> requirements, approval of a Submittal does not relieve Contractor from complying with Contract <br /> requirements. The Owner's approval of a Submittal did not constitute a waiver of the Contract <br /> requirements. The Owner or Owner's Representative shall respond to a Submittal within thirty(30) days <br /> of receipt. The Owner or Owner's Representative may extend this time for good cause by notifying the <br /> Contractor. The Owner will not be obligated to accept or pay for Work performed by the Contractor that <br /> may be affected by materials, Equipment,or methods of work not submitted in a timely manner so that <br /> final review can be accomplished before the affected Work is complete. The Owner shall not be <br /> responsible for Delays, inefficiencies, or any additional costs or expenses caused in whole or in part by <br /> Contractor's failure to submit required information in sufficient time for review, comment, and <br /> correction. Contractor's failure to submit required information in sufficient time for review, comment <br /> and correction shall be deemed a waiver of any and all Contract Claims for adjustment of Contract Sum <br /> or Contract Time arising out of, or related to, such a Submittal. Contractor acknowledges and agrees that <br /> it may not rely upon receiving the Owner's response to a Submittal in less than thirty(30)days,unless the <br /> Owner explicitly changes this section by a signed Change Order. Requests for information or <br /> clarification from the Contractor to the Owner shall be treated as a Submittal. <br /> 2.5. CONTRACTOR'S COPIES OF CONTRACT DOCUMENTS <br /> The Contractor shall keep at the construction site at least one set of Contract Documents and one set of <br /> full-size Drawings that shall be available to the Owner's Representative and Owner. <br /> 3. OWNER <br /> 3.1. GENERAL <br /> The Owner, and the Owner's Representative, shall have the authority to act as the sole judge of the Work, <br /> Equipment and materials with respect to both quantity and quality as set forth in the Contract. It is <br /> expressly stipulated that the Drawings, Specifications and other Contract Documents set forth the <br /> requirements as to the nature of the completed Work and do not purport to control the method of <br /> performing Work except in those instances where the nature of the completed Work is dependent on the <br /> method of performance. <br /> 00 7200 - 8 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.