My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 12 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> e. An elevator contractor license, if required by Chapter 70.87 RCW. <br /> 4. Not be disqualified from bidding on any public works contract under RCW 39.06.010 or <br /> 39.12.065(3). <br /> 5. If bidding on a public works project subject to the apprenticeship utilization requirements in <br /> RCW 39.04.320, not have been found out of compliance by the Washington state apprenticeship <br /> and training council for working apprentices out of ratio,without appropriate supervision, or <br /> outside their approved work processes as outlined in their standards of apprenticeship under <br /> chapter 49.04 RCW for the one-year period immediately preceding the date of the bid <br /> solicitation; and <br /> 6. Within the three-yearperiod immediatelyprecedingthe date of the bid solicitation,not have been <br /> Y <br /> determined by a final and binding citation and notice of assessment issued by the department of 1 <br /> labor and industries or through a civil judgment entered by a court of limited or general <br /> jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of chapter <br /> 49.46, 49.48, or 49.52 RCW. <br /> The Contract Documents shall apply to Subcontractors and Suppliers as if each had signed the Contract <br /> with the Owner. Contractor shall include the provisions of these Contract Documents or a"flow down" <br /> clause in each contract with Subcontractors and Suppliers. <br /> 4.4. RESPONSIBILITIES <br /> 4.4.1. Subcontractors, Manufacturers and Suppliers <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of Subcontractors, <br /> manufacturers, Suppliers and their employees. <br /> 4.4.2. Contractor's Employees <br /> The Contractor shall be responsible for the adequacy, efficiency and sufficiency of its employees. <br /> Workers shall have sufficient knowledge, skill and experience to perform properly the Work assigned to <br /> them. <br /> 4.4.3. Payment for Labor and Materials <br /> The Contractor shall pay and require its Subcontractors to pay any and all accounts for labor including <br /> Worker's Compensation premiums, State Unemployment and Federal Social Security payments and other <br /> wage and salary deductions required by law. The Contractor also shall pay and cause its Subcontractors <br /> to pay any and all accounts for services, Equipment, and materials used by him and its Subcontractors <br /> during the performance of Work under this Contract. The Contractor shall pay such accounts as they <br /> become due and payable. If requested by the Owner, the Contractor shall promptly furnish proof of <br /> payment of such accounts to the Owner. <br /> 4.4.4. Attention to Work <br /> The Contractor, acting through its representative, shall give personal attention to and shall manage the <br /> Work so that it shall be prosecuted faithfully and completed under the Project schedule. When its <br /> representative is not personally present at the Project Site, its designated alternate shall be available and <br /> shall have the authority to act in matters relating to this Contract. <br /> 4.4.5. Safety <br /> The Contractor alone shall be responsible for safety on the job Site, including,but not limited to, the <br /> safety of its and its Subcontractor's employees. The Contractor shall maintain the Project Site and <br /> perform the Work in a manner which meets the Owner's responsibility under statutory and common law <br /> for the provision of a safe place to work. <br /> 00 7200 - 12 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.