City of Everett 00 7200 - 22 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> Owner's Representative finds materials, Equipment, or workmanship that do not meet the terms of the <br /> Contract,he or she will prepare a Punch List of such items and submit it to the Contractor. Following <br /> completion of the corrective Work by the Contractor,the Owner's Representative will notify the Owner <br /> that the Work has been completed in accordance with the Contract. The Owner shall make the final <br /> determination of acceptability and completion. For portions of the Project not previously accepted as <br /> substantially complete,the conditions of guarantee shall commence on the date that the Owner determines <br /> the Project is complete. <br /> 6. CHANGES <br /> 6.1 OWNER'S RIGHT TO DIRECT CHANGES TO THE WORK <br /> The Owner reserves the right to change the Work at any time. Such changes shall not invalidate the <br /> Contract nor release the surety, and the Contractor agrees to perform the Work as changed. Among <br /> others, these changes and alterations may include: <br /> 1. Deleting or omit any part of the Work, Equipment or material to be provided under this Contract, <br /> and <br /> 2. Increasing or decreasing quantities, <br /> 3. Altering Specifications, designs, or both, <br /> 4. Altering the way the Work is to be done, <br /> 5. Adding new Work or Extra Work, <br /> 6. Altering facilities, Equipment, materials, services,or sites,provided by the Owner, and <br /> 7. Ordering the Contractor to accelerate or Delay Work. <br /> If the Contractor and Owner do not agree upon scope of Work changed or adjustment to the Contract Sum <br /> and Contract Time, the Owner may, at its sole option,unilaterally direct the Contractor to implement any <br /> change by notice. The Owner shall not pay or be responsible or liable for any change implemented by the <br /> Contractor without explicit notice from the Owner to proceed. <br /> 6.2 EXTRA WORK <br /> At its sole option,the Owner may(1) perform Extra Work itself, (2) employ others to do it, (3) direct the <br /> Contractor to perform the Extra Work at existing unit bid price, (4)direct the Contractor to perform the <br /> Extra Work at a mutually agreed upon price, or(5)direct the Contractor to perform the Extra Work on a <br /> Force Account basis. <br /> 6.3 CHANGE ORDERS <br /> Changes to the Work may result in an increase or decrease in Contract Sum, as provided in 9.2. <br /> PAYMENT FOR CHANGES. Requests for an increase in Contract Time must be made as provided in <br /> 5.2.2.2 Extensions of Contract Time, as applicable. Substantial changes in Contract Time, Contract <br /> Sum or Work will often be negotiated and agreed between the Contractor and Owner before the Owner <br /> directs the Contractor to proceed with the change. <br /> If the Contractor and Owner agree on the scope of Work and any changes to Contract Sum and Contract <br /> Time,the Contractor and Owner shall execute an agreed Change Order. However, if the Contractor and <br /> Owner do not agree, the Owner may, in its sole discretion, issue a unilateral Change Order changing the <br /> scope of Work and making any adjustments to the Contract Sum pursuant to 9.2. PAYMENT FOR <br /> CHANGES and Contract Time in such amount and for such time as the Owner thinks appropriate. <br /> Contractor agrees to use the agreed and unilateral Change Order attached to these General Conditions or <br /> otherwise provided by Owner. The Contractor accepts all requirements,terms and conditions of a <br /> Change Order by: signing it;writing a separate acceptance; or by failing to notify the Owner immediately <br /> in writing that Contractor disagrees with the Change Order and does not intend to be bound by its terms. <br /> 00 7200 - 22 GENERAL CONDITIONS <br />