My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - 37 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> 2. Travel Allowance and Subsistence. This includes the actual costs of allowances for travel or <br /> subsistence paid to employees in the course of their work on the item. This reimbursement will be <br /> made only if such allowances are required by a regional labor agreement or are normally paid by <br /> the Contractor to comparable labor for performing other work. <br /> 3. Industrial Insurance and Medical Aid Premiums. The Owner will reimburse Contractor-paid <br /> premiums for Marine Industrial Insurance, for State of Washington Industrial Insurance, and <br /> Medical Aid Premiums that become an obligation of the Contractor and are chargeable to the <br /> Force Account Work. The Owner will not pay the Contractor for Medical Aid premiums that are <br /> paid by the employees. <br /> 4. Overhead and Profit. The Owner will pay the Contractor twenty-nine(29)percent of the sum of <br /> the costs listed in a, b, and c above to cover Project Overhead, general company Overhead,profit, <br /> and any other costs incurred. <br /> 9.6.2. Materials. <br /> The Owner will reimburse actual invoice cost for Contractor-supplied materials. This cost includes actual <br /> freight and express charges and taxes,provided that these costs have not been paid in some other manner <br /> under the Contract. A deduction will be made for any offered or available discounts or rebates if the <br /> Owner has provided the Contractor with the means to comply with the provisions allowing the discount. <br /> The Owner will then add twenty-one (21)percent of the balance to cover Project overhead,general <br /> company Overhead,profit, and any other cost of supplying materials. <br /> To support charges for materials, the Contractor shall provide the Owner's Representative with authentic, <br /> complete and accurate copies of vendor invoices, including freight and express bills. If invoices are not <br /> available for materials from the Contractor stocks, the Contractor shall certify actual costs by affidavit. <br /> If Contract Claims for materials costs are too high, inappropriate,or unsupported by satisfactory <br /> evidence,the Owner's Representative may determine the cost for all or part of the materials. When <br /> determined in this manner, the cost will be the lowest current wholesale price from a source that can <br /> supply the required quantity, including delivery costs. <br /> The Owner reserves the right to provide materials. If so,the Contractor will receive no payment for any <br /> costs, Overhead, or profit on such materials. <br /> 9.6.3. Equipment. <br /> The equipment rates shall be actual cost but shall not exceed the rates set forth in the AGC/WSDOT <br /> Equipment Rental Agreement in effect at the time the Work is performed, <br /> The approval of the Owner's Representative shall be required for the selection of machine-power tools or <br /> equipment prior to their use in Force Account situations. <br /> The payment for any machine-power tools or equipment shall be made according to the current <br /> AGC/WSDOT Equipment Rental Agreement in effect at the time the Force Account is authorized. The <br /> rates as set forth in the Rental Rate Blue Book(as modified by the current AGC/WSDOT Equipment <br /> Rental Agreement) are the maximum rates allowable for equipment of modern design and in good <br /> working condition. These rates shall be full compensation for all fuel, oil, lubrication,repairs, <br /> maintenance, and all other costs incidental to furnishing and operating the equipment except labor for <br /> operation. <br /> The Owner will add twenty-one(21)percent to equipment costs to cover Project Overhead,general <br /> company Overhead(excluding equipment Overhead included in the Rental Rate Blue Book), and profit. <br /> Current copies of the Rental Rate Blue Book and the AGC/WSDOT Equipment Rental Agreement will be <br /> maintained at each region office of the Washington State Department of Transportation and at each of the <br /> offices of the Associated General Contractors of America, in Seattle, Spokane, Tacoma,Washington and <br /> Wilsonville, Oregon,where they are available for inspection. <br /> 00 7200 - 37 GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.