Laserfiche WebLink
City of Everett 00 4336 - 1 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> SECTION 00 4336 - PROPOSED SUBCONTRACTORS FORM <br /> 1. For heating, ventilation, air conditioning, plumbing (as defined by RCW Chap. <br /> 18.106) and electrical work (as defined by RCW Chap. 19.28), and structural steel <br /> installation and rebar installation, Bidder MUST either identify itself or <br /> Subcontractors in the chart below. If Bidder believes such work is not part of the <br /> scope of Work, Bidder shall write "NO WORK". <br /> 2. Bidder shall not list more than one Subcontractor for each category of work <br /> identified, unless Subcontractors vary with bid alternates, in which case the Bidder <br /> must indicate which Subcontractor will be used for which alternate. <br /> 3. Bidder's bid shall be deemed nonresponsive and void if: <br /> A. For heating, ventilation, air conditioning, plumbing, electrical, structural <br /> steel installation and rebar installation, Bidder fails (1) to submit as part of <br /> the Bid the names of such Subcontractors, (2)to name itself to perform such <br /> Work, or (3) to write "No Work"; or <br /> B. Bidder names two or more Subcontractors to perform the same work. <br /> 4. The requirement to name the Bidder's proposed heating, ventilation and air <br /> conditioning, plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors applies only to proposed heating, ventilation and air conditioning, <br /> plumbing, electrical, structural steel installation and rebar installation <br /> subcontractors who will contract directly with the general contractor submitting the <br /> Bid to the City. <br /> 5. The heating, ventilation and air conditioning, plumbing, electrical portions of the <br /> chart below must be submitted with the bid proposal or within one hour of the <br /> published bid submittal time. <br /> 6. The structural steel installation and rebar installation portions of the chart below <br /> must be submitted with the bid proposal or within forty-eight hours of the published <br /> bid submittal time. <br /> The remainder of this page intentionally left blank <br /> 00 4336 - 1 PROPOSED SUBCONTRACTORS FORM <br /> Addendum 1 <br />