Laserfiche WebLink
with the requested 45-day notice prior to making any changes to our <br /> policy. We would request that the City would allow for the General <br /> Conditions to be modified to reflect this. <br /> Al. The City agrees to the proposed change. See this Addendum 2, Items 4 <br /> & 5. <br /> Q2. Regarding Section 00 7200, General Conditions, paragraph 15.3.14.7 <br /> Pollution Liability, considering this project does not involve the <br /> remediation, disposal or other handling of pollutants arising from <br /> transportation of hazardous materials, or involved remediation abatement <br /> with lead based paint or materials containing asbestos we request that <br /> this requirement be removed. <br /> A2. The does not agree to the proposed change. No changes made. <br /> Q3. We would request the city accept higher coverage limits in lieu of a Per <br /> Project aggregate endorsement requested under Section 07200, <br /> paragraph 15.3.14.1 - CGL. <br /> A3. The does not agree to the proposed change. No changes made. <br /> Item 7 - Sign in sheets for the Pre-bid meetings held on Dec 3rd, 2020 and Dec 10th, <br /> 2020 are attached. <br /> Attachments: <br /> Pages 5 & 6 - Section 00 4113 SECTION 00 4113 — BID FORM — STIPULATED <br /> (SINGLE-PRIME CONTRACT) <br /> December 3rd, 2020 Pre-bid sign in sheet <br /> December 10th, 2020 Pre-bid sign in sheet <br /> END OF ADDENDUM <br /> Addendum 2 Page 3 of 3 <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425) 257-8800• Fax (425) 257-8882 <br />