My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with the requested 45-day notice prior to making any changes to our <br /> policy. We would request that the City would allow for the General <br /> Conditions to be modified to reflect this. <br /> Al. The City agrees to the proposed change. See this Addendum 2, Items 4 <br /> & 5. <br /> Q2. Regarding Section 00 7200, General Conditions, paragraph 15.3.14.7 <br /> Pollution Liability, considering this project does not involve the <br /> remediation, disposal or other handling of pollutants arising from <br /> transportation of hazardous materials, or involved remediation abatement <br /> with lead based paint or materials containing asbestos we request that <br /> this requirement be removed. <br /> A2. The does not agree to the proposed change. No changes made. <br /> Q3. We would request the city accept higher coverage limits in lieu of a Per <br /> Project aggregate endorsement requested under Section 07200, <br /> paragraph 15.3.14.1 - CGL. <br /> A3. The does not agree to the proposed change. No changes made. <br /> Item 7 - Sign in sheets for the Pre-bid meetings held on Dec 3rd, 2020 and Dec 10th, <br /> 2020 are attached. <br /> Attachments: <br /> Pages 5 & 6 - Section 00 4113 SECTION 00 4113 — BID FORM — STIPULATED <br /> (SINGLE-PRIME CONTRACT) <br /> December 3rd, 2020 Pre-bid sign in sheet <br /> December 10th, 2020 Pre-bid sign in sheet <br /> END OF ADDENDUM <br /> Addendum 2 Page 3 of 3 <br /> CITY OF EVERETT• 3200 Cedar Street• Everett, WA 98201 • (425) 257-8800• Fax (425) 257-8882 <br />
The URL can be used to link to this page
Your browser does not support the video tag.