My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 6365 - 2 <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> Change Order No. <br /> CITY <br /> Attest: Approved as to Form: <br /> Mayor City Clerk City Attorney <br /> Date: Date: Date: <br /> Recommended By: <br /> Change Order Effective Date: <br /> As allowed by the contract, the City directs the Contractor as follows: <br /> 1. The Scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. The contract price shall be adjusted as described in this Change Order. <br /> 3. The duration of the Contract, and contractually scheduled completion date, shall <br /> be adjusted to the extent described in this Change Order. <br /> 4. Unless the Contractor timely and properly follows the procedures in the contract <br /> for seeking further equitable adjustment of time and compensation, including, but <br /> not limited to, delays, impacts, inefficiencies, overhead, and direct and indirect <br /> costs, and except as otherwise expressly provided herein, the Contractor will be <br /> barred from (a) asserting any claim for further adjustment of time and <br /> compensation arising out of, or relating to, the charges described in this Change <br /> Order or Work described in Exhibit A and (b) asserting an equitable adjustment <br /> of time or price arising earlier than the date of this Change order. <br /> This provision does not apply to requests for equitable adjustment of time or price <br /> for which the Contractor timely and properly provided notice of a differing site <br /> condition, protest, dispute, claim or Contract Claim as required by the Contract <br /> Documents. If the Contract Documents establish a time period for notice of a <br /> differing site condition, protest, dispute, claim, or Contract Claim that ends after <br /> the date of this Change Order, but relates to work performed prior to the date of <br /> this Change order, then this provision does not apply if the Contractor timely and <br /> properly submits such notice. <br /> 5. This Change Order only changes the contract between Contractor and City to <br /> the extent explicitly provided herein. <br /> 00 6365 - 2 CHANGE ORDER - UNILATERAL <br />
The URL can be used to link to this page
Your browser does not support the video tag.