My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Merrell Bros Inc. 2/1/2021
>
Contracts
>
Capital Contract
>
Merrell Bros Inc. 2/1/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/6/2021 10:54:13 AM
Creation date
2/3/2021 12:27:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Merrell Bros Inc.
Approval Date
2/1/2021
Council Approval Date
1/27/2021
Department
Public Works
Department Project Manager
John Nottingham
Subject / Project Title
2021 Biosolids and Backwash Solids Removal
Public Works WO Number
UT3752-1/20
Tracking Number
0002758
Total Compensation
$1,038,792.30
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Merrell Bros Inc. 7/26/2021 Change Order 1
(Contract)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
298
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Everett 00 7200 - <br /> 2021 Biosolids and Backwash Solids Removal UT 3752-1 / 20 <br /> 8.1. General 25 <br /> 8.2. Product Data 25 <br /> 8.3. Quality 25 <br /> 8.4. Material and Equipment Specified by Name 25 <br /> 8.5. Requests for Substitution 26 <br /> 8.6. Demonstration of Compliance with Contract Requirements 26 <br /> 8.6.1. Inspection 26 <br /> 8.6.2. Samples of Materials 26 <br /> 8.6.3. Certification 27 <br /> 8.6.4. Inspection at Point of Manufacturing 27 <br /> 8.6.5. Testing and Commissioning of Completed Work 27 <br /> 8.6.6. Storage of Materials and Equipment 27 <br /> 8.6.7. Manufacturer's Directions 27 <br /> 8.7. Defective Work 27 <br /> 8.7.1. Correction of Defective Work 27 <br /> 8.7.2. Retention of Defective Work 28 <br /> 8.8. Materials and Equipment Furnished by Owner 28 <br /> 8.9. Guarantee 28 <br /> 8.10. Correction Period 28 <br /> 9. MEASUREMENT AND PAYMENT 29 <br /> 9.1. Payments to Contractor 29 <br /> 9.1.1. Schedule of Values 29 <br /> 9.1.2. Progress Payments 30 <br /> 9.1.2.1 Payment Request Procedures: 30 <br /> 9.1.2.2 Review Procedures. 30 <br /> 9.1.2.3 Retained Percentage 30 <br /> 9.1.2.4 Withholding 30 <br /> 9.1.3. Final Payment 31 <br /> 9.2. Payment for Changes 32 <br /> 9.2.1. Changes in Estimated Quantities of Unit Price Work 32 <br /> 9.2.1.1. Increased Quantities 32 <br /> 9.2.1.2. Decreased Quantities 32 <br /> 9.2.1.3. Limitations 32 <br /> 9.2.2. Changes in Work Not Covered By Unit Prices 32 <br /> 9.2.3. Deleted Work 33 <br /> 9.3. Charges to Contractor 33 <br /> 9.4. Compensation to Owner for Time Extension 34 <br /> 9.5. Adjustment of Contract Sum 34 <br /> 9.5.1 Calculation 34 <br /> 9.5.2 Limitations 34 <br /> 9.5.3 Unabsorbed and Extended Overhead 35 <br /> 9.6. Force Account 35 <br /> 9.6.1 Labor. 36 <br /> 9.6.2. Materials 36 <br /> 00 7200 - iii GENERAL CONDITIONS <br />
The URL can be used to link to this page
Your browser does not support the video tag.