My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Stantec Consulting Services, Inc. 5/9/2016
>
Contracts
>
6 Years Then Destroy
>
2016
>
Stantec Consulting Services, Inc. 5/9/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/27/2016 11:35:48 AM
Creation date
5/27/2016 11:35:40 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Stantec Consulting Services, Inc.
Approval Date
5/9/2016
End Date
12/31/2016
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
On-call Surveying Services
Tracking Number
0000094
Total Compensation
$85,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A-1 <br /> Scope of Work <br /> Project No. Surveying Services <br /> 1 The Contractor agrees to furnish the services of a licensed professional land surveyor(PLS)and <br /> appropriate tecbnical/survey field personnel to provide on-call survey services for the City as defined by <br /> the Task Assignment Scope of Services <br /> The survey crew shall work on an "as Required"basic only, as determined by the City's Project <br /> Manager or the Construction En•'neer If the Contractor is not in a position to provide the survey crew <br /> at the time requested by the City,the Contractor may decline the request without prejudice <br /> 3 Prior to mutual acceptance of a task assigpment,the Contractor will prepare a written itemized cost <br /> estimate for therequested services <br /> 4 The survey crew shall be supervised by a licensed PLS and shall coordinate with the Project Mana•-r <br /> or Construction Engineer, as required, to ensure all required surveying in the task assignment is <br /> performed as requested by the City <br /> 5 The survey party chief shall he responsible to keep all notes in a city-fiirnished book and shall record <br /> Documents To Be Furnished By The Consultant <br /> 1 Completed (city-Furn•shed) field book <br /> Survey deliverables will typically include' <br /> a Original drawings on 77"X34"reproducible media (mylar) <br /> b Flec#ronic drawing files in Civil ID, or AutoCAD "dwg"format <br /> c Point files including point#,northing, easting, elevation, and description <br /> d Land XMT,files <br /> e Any digital terrain model file(eg• DTM,DEM, etc)g-nerated from the assigned work <br /> DOT Form 140-089 EF Exhibit A-1 <br /> Revised 6/05 <br />
The URL can be used to link to this page
Your browser does not support the video tag.