My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2021/02/03 Council Agenda Packet
>
Council Agenda Packets
>
2021
>
2021/02/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/8/2021 11:55:53 AM
Creation date
2/3/2021 7:42:48 PM
Metadata
Fields
Template:
Council Agenda Packet
Date
2/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Phase 2 Detailed Design <br />• Phase 3 Construction Assistance <br />b. Scope tasks for Phases 2 and 3 will be amended based on the outcome of Phase <br />1. <br />c. Budget for the project scope is based on a Phase 1 project schedule of 6 months, <br />commencing with notice -to -proceed. The budgets and durations of Phases 2 & 3 <br />are to be determined based on the outcome of Phase 1. <br />d. Schedule: <br />• NTP on Feb. 15, 2021 <br />• Data Review: Feb. 15 — March 15, 2021 <br />• Site Reconnaissance, preliminary basemap, and geotechnical review: <br />March 15 — April 15, 2021 <br />• Review and Verification of Previously Modeled CSO Storage Volume and <br />system operations: Feb. 15 - April 15, 2021 <br />• Development of Design and Evaluation Criteria: March 15 — April 30, 2021 <br />• Development and Evaluation of CSO Control Options: April 30—June 30, <br />2021 <br />• BODR and Final Design Scope Development: July 1— August 15, 2021 <br />• Phase 1 completion by August 15, 2021 <br />e. Deliverables will be in electronic format only. <br />f. Meetings will be held virtually. <br />g. The Consultant may shift budget between work tasks. <br />h. The City will provide certain documents including, but not limited to the list <br />below. <br />i. The City's drafting Standards will be used. <br />j. Design and Standard Specifications and Details shall utilize: <br />• City of Everett's Design and Construction Standards. <br />• Washington State Department of Transportation/American Public Works <br />Association (WSDOT/APWA), Standard Specifications for Road, Bridge <br />and Municipal Construction, 2010 edition. <br />• The City's master specifications and applicable additional provisions to <br />the Standard Specifications. <br />• Washington Department of Ecology latest edition of Criteria for Sewage <br />Works Design (the Orange Book). <br />k. The Consultant will rely on General and Special Provisions, Standard <br />Specifications, and Standard Details provided by the City. The Consultant may <br />recommend changes to the Standard Specifications where project conditions <br />warrant. The Consultant will prepare special technical specifications where <br />required by the project. <br />Wage <br />
The URL can be used to link to this page
Your browser does not support the video tag.