Laserfiche WebLink
tz EVE R E T TCity Council Agenda Item Cover She <br />Project title: Call for Bids for the construction of Reservoir 2 Replacement Project <br />Council Bill # <br />• • • • . • + • . i ' i . I I . i . f , + . f f * * * 1 F I ' . * * . * * * 1 ■ * * . • * i * • I + f i + i * * t * f * i i • • 1 • l i * • * i I * l i , i • 1.i i i <br />Agenda dates requested: <br />1/13/2021 <br />Briefing <br />Proposed action <br />Consent 1/13/21 <br />Action <br />Ordinance <br />Public hearing. <br />Yes <br />X No <br />! t! !+ i • f F+ 1 !' f! t !* t <br />Budget amendment: <br />Yes X No <br />PowerPoint presentation: <br />Yes X No <br />Attachments: <br />None <br />•** I I 1# h+ F* 4 f F; <br />Department(s) involved: <br />Public Works <br />Contact person: <br />Souheil Nasr <br />Phone number: <br />(425) 25T7210 <br />Email: <br />snasr@everettwa.gov <br />Initialed by: <br />2LS <br />*****• I i i i i i L L i+ i* i i i f f Y 1 1 i Y i f** 1! ! • ** f 1 1 i i* 1 1 1 i • i■. 1.11i f f. i f 1 i i F f, 1• It 1 F 1 <br />Department head <br />I ****■ 1■ F-•.• 1 1• !!• Y .. i 1.•* 1 i 1* 1* 4 w! i L* !tit 1 i i• i. i•*.. i•.. 1 1• 1, 1 1 1, i• i i i**.. i• i <br />Consideration: Call for Bids <br />Project: Reservoir 2 Replacement (UP 3658) <br />Partner/Supplier: <br />Location: 702 Edwards Avenue, Rucker Hill <br />Preceding action: PS&O Dec 30, 2020 <br />.1 p.. 1.iY ..,.!• a!•7. J. a.J•!..f.77.•. !+. . .... <br />Fiscal5ummvtament:• • <br />tuna: <br />Funding source will be utilities fund. <br />Estimated expenditure for advertising for bids is $2,000.00. <br />Budget is $22,100,000. <br />Project summary statement: <br />+ <br />The Reservoir 2 Replacement project will replace the existing 109-year old Reservoir 2 <br />with a five million gallon storage facility to be located on the property adjacent to <br />e xisting Res 2. The new storage facility will obviate the need for the existing Reservoir 2, <br />thus eliminating the risk for a catastrophic failure of the western and southern <br />e mbankments of the reservoir which are in poor condition. The project will also replace <br />old 24" transmission lines between existing reservoir 2 and reservoir 1, and construct a <br />n ew 1,200 sf operations/storage building. <br />The project plans and specifications are ready to advertise for construction bids. <br />Recommendation (exact action requested of Council): <br />Authorize the Call for Bids for the construction of the Reservoir 2 Replacement Project. <br />