Combined Construction Inc. 2/10/2021 Change Order 1
>
Contracts
>
Capital Contract
>
Combined Construction Inc. 2/10/2021 Change Order 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 8:36:51 AM
Creation date
2/17/2021 8:36:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Combined Construction Inc.
Approval Date
2/10/2021
Department
Public Works
Department Project Manager
Gael Fisk / Mike Kangas
Subject / Project Title
Maple Heights Bridge Siesmic Retrofit
Public Works WO Number
PW3693
Amendment/Change Order
Change Order
Amendment/Change Order Number
1
Tracking Number
0002373
Total Compensation
$0.00
Contract Type
Capital Contract
Retention Period
10 Years Then Transfer to State Archivist
Document Relationships
Combined Construction Inc. 7/22/2020
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Project: Maple Heights Seismic Retrofit <br /> Change Order No.; 001 <br /> Change Order Effective Date: October 19, 2020 <br /> Contractor and City agree as follows: <br /> 1. The scope of Work shall be changed to the extent described in Exhibit A. <br /> 2. In full and complete compensation for the changes described in Exhibit A, <br /> including all direct and indirect costs and impacts, the contract price shall be <br /> adjusted as described in this Change Order. <br /> 3. The duration of the Contract shall be adjusted to the extent described in this <br /> Change Order. <br /> 4. Contractor waives and releases any and all claims arising out of, or related to, this <br /> Change Order, the work described in Exhibit A, and all work and actual or <br /> constructive changes that occurred or began prior to the date of this Change Order, <br /> including, but not limited to, claims for equitable adjustment of time and <br /> compensation, delay, impact, overhead, or inefficiencies. This provision does not <br /> apply to requests for equitable adjustment of time or price for which the Contractor <br /> timely and properly provided notice of a differing site condition, protest, dispute, <br /> claim or Contract Claim as required by the Contract Documents. If the Contract <br /> Documents establish a time period for notice of a differing site condition, protest, <br /> dispute, claim, or Contract Claim that ends after the date of this Change Order, but <br /> relates to work performed prior to the date of this Change Order, then this provision <br /> does not apply if the Contractor timely and properly submits such notice <br /> 5. This Change Order only changes the contract between Contractor and City to the <br /> extent explicitly provided herein. <br /> CITY <br /> Attest: Approved As to Form: <br /> Mayor i y Clerk City Attorney <br /> Date: cO'-ID-I D'I Date: 02 I0'09-00�-4 Date: 2 . { 2 <br /> Recommended By: <br /> Construction Project Engineer (if Engineering Department Director <br /> Manager (if applicable) Manager (if <br /> applicable) 6. ,tVn pplicable) ,/ <br /> 41, -c� Gael c sk 2 3 -z( <br /> Date: -5"_2/ Date: s A ate: L D te /�: <br /> CONT ACTOR <br /> 13 Date: h/ /'2i _ : <br /> • <br /> Page 2 of 3 % `'9S►�rN�'O. <br /> ' 20'1 \`\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.