Laserfiche WebLink
� � . <br /> Plan Check No. C 57702 <br /> Febntary 2, 1998 <br /> Page 6 of 6 <br /> � 11. Provide engineering and nailing requirements for the collar tie roof system with consideration of <br /> the load combinations specified in UBC 1603.6. <br /> �2. Provide construction material specifications. <br /> J3. Provide a lateral analysis of the existing structure to assure it's stability after total reartangement <br /> of the interior walls. <br /> Prepare a response letter showing where each item in this correction letter is addressed on the plan <br /> set. <br /> Upon resubmittal of the drawings, your application will be given prioriry and plan review will <br /> recommence. <br /> All required submittals shall be of sufficient detail and contain sufficient information to ensure that the i <br /> proposed structure will be constructed in compliance with all adopted codes. <br /> Si� � $incerelx, � <br /> �+ j�n <br /> n� J`�Steve Miller, PE <br /> Associate Engineer Associate Engineer <br /> n:l�ri'Ife�pkk.11 <br /> I <br />