Laserfiche WebLink
. ..:..; � � � � on � � <br /> STATE OF WASHINGiON <br /> DEPARTMENT OF HEALTH MAR 1 91998 <br /> P.O. Bor 4i8S1 • Olympia, Washingfo� 98500•:8i� <br /> .._.....__ ... .............................._.... <br /> CITY OF EVERETT <br /> MazC6 17, 1998 EnpineeringrPub�ic Services <br /> Greg Campbell ' <br /> 902 E. Maple <br /> Arlington, WA. 98223 <br /> RE: Everett Birth Center <br /> CRS k98-9038-5026-004 <br /> Dear Mr. Campbell: <br /> We received your response and revised drawing on Febtuary 16, 1998. Staff has completed a <br /> review of these documents and found them acceptable. The staffs review is pursuant to c6apter <br /> 246-329 WAC Childbirth Centers codified Rules, Regulations, and Standazds adopted by the <br /> department as amended to date. <br /> Local building officials have the authority for teview and approval of this construction project for <br /> occupancy of this faciliry putsuant to the State Building Code as acr,ended to date as adopted by <br /> the local jurisdiction. <br /> I am returning a stamped "Appcoved" drawing for your use at the job site. Final appmval is <br /> subject to applicable codes and field inspections. We recommend this document become a <br /> permanent part of the faciliry records. <br /> New construction uea shall not be occupied until it 6as been surveyed and/or approved by <br /> Facilities and Services Licensing and granted occupancy approval by the local building official. <br /> New facilities should apply for an appropriate license th*ough Licensing Administration at least <br /> six weeks pr;or to the anticipated opening date. <br /> Enclosed are two notification cards. Please complete and retum the Rreen card when <br /> construction beAins. Please complete and retum the pink card and one copv of the Certificate of <br /> Occupancy when consavction is complete. Staff will schedule all necessary inspections upon <br /> receipt of the pink cazd. Please allow four weeks notice for survey scheduling. <br /> Page 1 of 2 <br /> -�• ,a <br />