Laserfiche WebLink
INSPECTION REPORT <br /> /‘•/=4.r,„ <br />, -.../4 -7,r, �Date <br /> CO ( 0 Permit: Q \6O2OO9 <br /> 1 <br /> Contractor: <br /> Owner: <br /> Site Address: S 2 d & \ )\ , ' <br /> TYPE OF INSPECAON REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In p Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing oftop Units ❑Water Service <br /> ❑Grounding ❑Insulation echanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ PARTIAL APPROVAL FINAL APPROVAL THIS P R <br /> Ag)(PROVAL <br /> FOR T.C.O. ❑ CORRECTION REQUESTED s0� <br /> . ❑ OK FOR C.O. ❑ VIOLATION ; <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> 9 Inspector: Date: i C <br /> — <br /> EIR(10/06) DATABAR,INC. <br /> 1 <br />