My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Otak Inc. 1/25/2021
>
Contracts
>
6 Years Then Destroy
>
2022
>
Otak Inc. 1/25/2021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2021 12:37:16 PM
Creation date
2/17/2021 12:36:39 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Otak Inc.
Approval Date
1/25/2021
Council Approval Date
12/30/2020
End Date
12/31/2022
Department
Public Works
Department Project Manager
Ryan Sass
Subject / Project Title
On-call surveying services
Tracking Number
0002768
Total Compensation
$200,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> 2021-2022 On-Call Surveying Services <br /> 1.The Contractor agrees to furnish the service of a licensed professional land surveyor(PLS)and appropriate <br /> technical/survey field personnel to provide on-call survey services for the City as defined by the Task Assignment <br /> Scope of Services and recorded on the Formal Task Assignment Document(attached). <br /> 2, The survey crew shall work on an"as Required"basis only, as determined by the City's Project Manager or <br /> Construction Engineer.If the Contractor is not in a position to provide the survey crew at the time requested by the <br /> City,the Contractor may decline the request without prejudice. <br /> 3.Prior to mutual acceptance of a task assignment,the Contractor will prepare a written itemized cost estimate for <br /> the requested services. <br /> 4. The survey crew shall be supervised by a licensed PLS and shall coordinate with the Project Manager or <br /> Construction Engineer, as required,to ensure all required surveying in the task assignment is performed as requested <br /> by the City. <br /> 5. The survey party chief shall be responsible to keep all notes in a city-furnished book and shall record a day-to-day <br /> report of all survey activities. Said survey book shall be returned to the City Project Manager or Construction <br /> Engineer a the completion of the work.Survey field notes shall conform to the requirements of the most recent <br /> edition of the"Survey and CAD Standards for the City of Everett," <br /> 6.All survey drawings,cross sections and profiles shall be prepared in AutoCAD in accordance with the most recent <br /> edition of the"Survey and CAD Standards for the City of Everett." <br /> 7.The Surveyor shall schedule and meet with the City CAD Manager prior to beginning any survey work to <br /> establish control,required standards,electronic exchange standards and to pick up a field book. This meeting is <br /> required for each task assignment. <br /> Documents to be furnished by the Contractor <br /> I.Completed(City-furnished)field book. <br /> 2.Survey deliverables will typically include: <br /> a.Original drawings on 22"x 34"reproducible media <br /> b.Electronic drawing files in Civil 3D or AutoCAD"dwg"format <br /> c.Point files including point#,northing,Basting,elevation and description <br /> d.Land XML files <br /> e.Any digital terrain model file(eg:DTM,DEM,etc.)generated from the assigned work <br /> Page 12 <br /> (Form Approved by City Attorney's Office January 7,2010,updated August 16,2019) <br />
The URL can be used to link to this page
Your browser does not support the video tag.