Laserfiche WebLink
�: . <br /> Hart Crowser <br /> � J-344�01 <br /> � <br /> �;: <br /> �� APYENDLY A <br /> gIEI,D E�LORATIONS ML'THODS AIVD ANALYSIS <br /> i <br /> ' This appendx uocumenu the processes Hart Crowser ases in <br /> � determinin�; the nature of tt:� so�7s underlying the project site addressed <br /> �, by this report. The disrassion includes information on the following <br /> subjects: <br /> ► Ecplorations and Theu I.ocation <br /> ► The Use of Auger Boring <br /> ► Standard Penetratiqn Test (SP'1� Proc�dures <br /> . Explorations and Their Lacation <br /> Subsurface explorations for this project include dn7ling 5ve borings. <br /> The exploration log within this appendix show our interpretation of the <br /> cinlling (or excavation), sampling, and testing data. They indicate the <br /> depth where the soi7s cbange. Note that the change may be gaduaL In <br /> • the fieid, we classified the samples taken from the explorations <br /> according to the methods presented on Figure A-1 - Key to Fxploration <br /> L,o�.s. This figure also provides a ]egend explaining the symbols and <br /> abbreviations used m the ]ogs. <br /> Location o[Ezplorarions. Figure 2 shows the ]ocation of explorations, <br /> located by hand taping or pacing from existing physical features. The <br /> ground siuface elevations at these locations were interpreted from <br /> � elevabons of existing monitoring wells across the site. The method ued <br /> determines the accuracy of the ]ocation and elevation of the <br /> explorations. <br /> 7Tu Use af Auger Borin� <br /> With depths ran�ng from 43 to 43.5 feet below the ground surface, frve <br /> hollow-stem auger borings, desigiated HC-1 throueh HC-5, were drilled <br /> from October ?2, 1992 to October 26, 1992. The borines used a 3'/e- <br /> inch inside diameter h�ilow-stem auger and were advanced with a truck- <br /> mounted drill rig subcontracted by Hart Crowser. The drIlling was <br /> continuously observed by an engineering geologist from Hart Crowser. <br /> DetaHed fizld logs were prepared of each boring. Using the Standazd <br /> i,3'� <br /> Page A-1 <br />