My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1135 CRAFTSMAN WAY Geotech Report 2018-01-02 MF Import
>
Address Records
>
CRAFTSMAN WAY
>
1135
>
Geotech Report
>
1135 CRAFTSMAN WAY Geotech Report 2018-01-02 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2022 1:43:16 PM
Creation date
2/18/2021 9:52:53 AM
Metadata
Fields
Template:
Address Document
Street Name
CRAFTSMAN WAY
Street Number
1135
Address Document Type
Geotech Report
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Hart Crowser <br /> J-344b-Ol <br /> ► AddiUonal studies and consultation, if needed. <br /> Scope Included Borirrgs, Labaratory Testing, �nd Analysu <br /> Our scope of work for this project inc]uded: <br /> ► Reviewing Hart Crowser's December 4, 1991, Environmental <br /> Property Assessment report and preliminary geotechnical design <br /> letter both on the site; <br /> ► Dnlling five borings and obtaining samples; <br /> ► Testing so�1 samples for geotechnical indez properties; <br /> ► Completing geotechnical engineering analyses; and <br /> ► Producing this geotechnical engineering desigi report. <br /> Limitations of Our Study and This Report <br /> Hart Crowser's work w�as conducted in accordance with our proposal <br /> dated August 27, 1992 This report has been prepazed for the exclusive <br /> use of HNTB and MSRC for specific applications to the subject project <br /> and site. This smdy has been performed in accordance with generally <br /> accepted geotechnical engineering practices in the same or simlar <br /> localities, related to the nature of the work accomplished at the time <br /> the services are performed. No other warranry, express or implied, is <br /> made. <br /> OUR UiVDII2STANDING OF THE PROJEGT <br /> Figure 1 shows the ]ocation of the site in Everett, \Vashington Figure 2 <br /> illustrates the propased complex Our understanding of the project is <br /> based on information from HNTB: . <br /> ► The e�asting warehouse w71 be demolished. <br /> ► The new warehouse wIIl probably be constructed as t�t-up concrete. <br /> Columns will be on 40-foot centers with 80 kip loads. Perimeter <br /> walls w�11 be ]oaded at 5 ldps per lineal foo� A mezsanine level will <br /> Page\2�; <br />
The URL can be used to link to this page
Your browser does not support the video tag.