Laserfiche WebLink
2.6 PICKUP LOCATION <br />Water Pollution Control Facility (WPCF) <br />4027 4th Street SE <br />Everett, WA 98201 <br />See Appendix C for directions to WPCF and location of Biosolids Pad at WPCF. <br />2.7 PICKUP SITE HOURS <br />1. The Supplier will be given access to the WPCF biosolids pad. <br />2. Biosolids Pad access will be available from 6:00 am to 10:00 pm. Available 7 days per week. <br />A. Per Everett Municipal Code (EMC) 20.08, excessive noise is limited to the following <br />times. <br />i. 7:00 a.m. to 10:00 p.m. on weekdays <br />ii. 8:00 a.m. to 6:00 p.m. on weekends and state recognized holidays. <br />3. Provide a work schedule seven days in advance for approval by City's project manager. <br />4. Supplier must coordinate all activities with Project Manager to ensure operations don't <br />conflict with other projects at the WPCF. <br />5. Supplier must notify project manager twenty-four (24) hours in advance of any requirements <br />to relocate equipment to perform requirements of specifications. <br />2.8 WEIGHING OF MATERIAL <br />1. The City of Everett will provide a certified scale to supplier to weigh biosolids prior to <br />departure from WPCF. <br />A. Biosolids will be weighed by wet tons. <br />B. Wet tons are determined by gross weight of a loaded truck less the tare weight. <br />2. On a daily basis, the supplier must provide the City of Everett a receipt of the net weight of <br />biosolids hauled. <br />A. Receipts provided must include; <br />i. Truck identification number, <br />ii. Date of haul, <br />iii. Net weight per truck. <br />2.9 BIOSOLIDS APPLICATION RATE CALCULATION SUBMITTAL <br />All suppliers must submit a draft application rate calculation worksheet. Application rate <br />worksheets can be submitted with bids or must be submitted by the end of the third business <br />day following bid opening for the bid to be considered responsive. <br />1. Worksheets must be submitted for the proposed site location(s) listed in the bid. Calculations <br />must use the data provided in Appendix A. A sample rate calculation worksheet is provided in <br />Appendix D. <br />2. To be considered for award, the Site -Specific Land Application Plan must be submitted by the <br />end of the seventh business day following the bid opening to the City. <br />2.10 CONTRACTOR REGISTRATION <br />The City of Everett is prohibited from executing a contract with a Contractor who is not <br />registered or licensed as required by state law. <br />8 <br />