Laserfiche WebLink
Concept Design <br />1 /8" = V <br />Side A I North <br />Remove upper cabinet and install new lower cabinet <br />between poles. <br />New cabinet is 48"x I I0"= 36.6 SF <br />Skirt is 64 SF fabricated from .080 aluminum and 1" <br />welded aluminum sq tubing. <br />Paint pylon poles and cabinet black <br />Cut poles down <br />Side B I South <br />9 2 <br />File: Greenwood Everett <br />CLIENT <br />Greenwood Heating Everett <br />PROJECT <br />Wall & Pylon sign <br />CONTACT Michael Porter <br />Estimate/ Job #: SO 6285 <br />Salesperson: Brian <br />Designer: Brian <br />Project manager: N/A <br />Revisions: <br />Concept 9/23/2020 <br />❑ Final for production <br />BUILDING OWNER APPROVAL <br />Signature <br />Date <br />CLIENT APPROVAL <br />Signature <br />Date <br />NORTHWEST <br />SIGN & DESIGN <br />172o Beaton Rd. SE <br />Monroe, WA 98272 <br />www.NWSigns.com <br />(425) 844-6415 <br />Contractors Lic#NWWHOS'929M9 <br />U�ELECTRIC SIGNS PRODUCED AT NW SIGNS <br />CONFORM TO UL48 AND DISPLAY THE <br />UNDERWRITERS LABORATORIES LABEL <br />