My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3532 BROADWAY UNION 76 2021-02-22
>
Address Records
>
BROADWAY
>
3532
>
UNION 76
>
3532 BROADWAY UNION 76 2021-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 7:52:40 AM
Creation date
2/22/2021 7:51:53 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
3532
Tenant Name
UNION 76
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> REG F 4-22-2O 9(NON) 0 :27 <br /> 023469 <br /> CT 1 <br /> PERMIT i [ <br /> 04009 <br /> of <br /> <%, 7.s/3 ETT <br /> •M i--.n t-'n l.q <br /> a�5y <br /> (425)257-8810 - <br /> 9061 <br /> Plan Check No.: S1904-009 <br /> Application Date: 4/19/2019 <br /> Tenant: 76 GAS <br /> Owner: CF UNITED PROPCO LLC <br /> Job Address: 3532 BROADWAY AVE <br /> Proposed Use: <br /> Description of Work: REPLACE(2) EXISTING CANOPY SIGNS/ <br /> RE-FACE EXISTING POLE <br /> Plan Check Fee Paid: $190.61 <br /> The building permit application for the above-referenced project is being conditionally accepted for filing <br /> pending the determination of its completeness. <br /> If the City review determines that any additional land use approval or any additional information is <br /> required to complete your building permit application,it will be necessary to submit this additional <br /> information or acquire the additional land use approval prior to your application being considered complete <br /> for filing.If no other land use approval or additional information is required,your building permit <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan review fees <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSUED <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. <br /> Signature � � Date <br /> FILE COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.