My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8215 BROADWAY T MOBILE ANTENNAS 2021-02-22
>
Address Records
>
BROADWAY
>
8215
>
T MOBILE ANTENNAS
>
8215 BROADWAY T MOBILE ANTENNAS 2021-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 8:15:43 AM
Creation date
2/22/2021 8:13:43 AM
Metadata
Fields
Template:
Address Document
Street Name
BROADWAY
Street Number
8215
Tenant Name
T MOBILE ANTENNAS
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60 ft Monopole Tower Structural Analysis June 20, 2019 <br /> Project Number 2019777.824022.02, Order 489098, Revision 0 CCI BU No 824022 <br /> Page 4 <br /> 3)ANALYSIS PROCEDURE <br /> Table 3 -Documents Provided <br /> Document Remarks Reference Source <br /> Valmont Microflect Order#: <br /> Tower Drawings 11011-00, dated 7/21/2000 3536634 CCISITES <br /> Foundation Drawings PSM Job#: 20238, dated 3536632 CCISITES <br /> 05/17/2000 <br /> ADaPT Job#: WA00-4034, dated ! <br /> Geotechnical Report 05/18/2000 3536633 CCISITES <br /> 3.1) Analysis Method <br /> tnxTower (version 8.0.5.0), a commercially available analysis software package, was used to create a <br /> three-dimensional model of the tower and calculate member stresses for various loading cases. <br /> Selected output from the analysis is included in Appendix A. <br /> 3.2) Assumptions <br /> 1) Tower and structures were built and maintained in accordance with the manufacturer's <br /> specifications. <br /> 2) The configuration of antennas, transmission cables, mounts and other appurtenances are as <br /> specified in Tables 1 and 2 and the referenced drawings. <br /> This analysis may be affected if any assumptions are not valid or have been made in error. GPD <br /> should be notified to determine the effect on the structural integrity of the tower. <br /> 4)ANALYSIS RESULTS <br /> Table 4-Section Capacity (Summary) <br /> Section Elevation(ft) Component Size Critical P(K) SF*P_allow % Pass I Fail <br /> No. Type Element (K) Capacity <br /> L1 I 60-31.75 I Pole TP23.06x19.68x0.1875 1 -7.75 ( 821.65 I 30.0 Pass I <br /> T L2 31.75-0 Pole TP26.5x22.1765x0.2188 2 -10.95 I- 1126.491—59.8 Pass J <br /> Summary ELC: LC7 <br /> r Pole(L2) 59.8 Pass <br /> Rating= I 59.8 I Pass <br /> tnxTower Report-version 8.0.5.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.