Laserfiche WebLink
• <br /> • <br /> CROWN 1505 Westlake Ave N Phone: (206) 336-3204 <br /> Seattle,WA 98109 Fax: <br /> CASTLE www.crowncastle com <br /> August 30,2019 <br /> City of Everett <br /> Permit Services <br /> 320o Cedar St. <br /> Everett,WA 98201 <br /> RE: Eligible Facilities Request to modify equipment on a communications tower located at: <br /> 8215 Broadway,Everett,WA,98203 <br /> Crown Site Number:824022/Crown Site Name:Feely <br /> Customer Site Number:SEo1690A/Application Number:489098 <br /> Crown Castle USA Inc.("Crown Castle")on behalf of T-Mobile West LLC("T-Mobile")is submitting the attached <br /> Eligible Facilities Request application to modify transmission equipment on a telecommunications tower located at 8215 <br /> Broadway,Everett,WA 98203 in CITY OF EVERETT,WA(the"Feely Tower"). <br /> Section 6409 of the Middle Class Tax Relief and Job Creation Act of 2012,commonly known as the"Spectrum Act" <br /> (Pub.Law No.112-96,126 Stat 156),mandates that state and local governments"may not deny,and shall approve,any <br /> eligible facilities request for a modification of an existing wireless tower or base station that does not substantially <br /> change the physical dimensions of such tower or base station." Additionally,if"the reviewing State or local government <br /> determines that the application is incomplete"[they]"must provide written notice to the applicant within 3o days of <br /> receipt of the application,clearly and specifically delineating all missing documents or information." Under federal law, <br /> an Eligible Facilities Request is deemed granted with written notification in sixty(6o)days after an application is filed <br /> with a local jurisdiction,excluding tolling. <br /> T-Mobile proposes to modify the"Feely Tower"as follows: <br /> Replace(3)antennas;remove(i)RF module and(1)TMA's;and install(3)RRU's and(i)hybrid cable on <br /> existing tower.T-Mobile also proposes to replace(1)cabinet;remove(3)system modules and(i)RF module <br /> and(i)cabinet;relocate(i)system module,(3)RF modules,and(i)COVP;and install(1)CSR and(2)sub- <br /> tracks with(5)modules within existing compound. <br /> Itemized list of submittal documents: <br /> • (1)Cover Letter <br /> • (1)Permit Application <br /> • (3)Structural Analysis stamped by Washington State engineer <br /> • (3)Construction Drawings stamped by Washington State engineer—11"x17"print <br /> T-Mobile is committed to working cooperatively with all jurisdictions around the country to secure expeditious approval <br /> of requests to modify existing personal wireless service facilities. If you should require more information regarding the <br /> Spectrum Act,please do not hesitate to contact me with your questions. <br /> The Foundation for a Wireless World, <br /> CrownCastle.cor <br />