Laserfiche WebLink
• • <br /> CITY OF EVERETT <br /> PERMIT APPLICATION INFORMATION <br /> CONSTRUCTION MANAGER/PA/PM: Carson Hornor&Artie Huycke/Johnny Edwards <br /> PROJECT NAME: 45-01 Structural Vertical Upgrade Phase 1 Member <br /> Strengthening <br /> LOCATION (BLDG/FLR/COL): 45-01—Roof Truss and Attic Area <br /> PROJECT TIMELINE&PERMIT NEED DATE: 8/28/19 <br /> MAXIMO JOB#: 22312065 (need to confirm) <br /> CHARGELINE#: GG=1511005=DTLCAPGG16NN013=CAPGSXAN=X=GG=PUNE=699 <br /> (need to confirm) <br /> CONTRACT PRICE OF WORK BEING $500,000 <br /> PERMITTED: <br /> CONTRACTOR NAME: Skanska USA Building Inc. <br /> CONTRACTOR E-MAIL Jason.Floyd@skanska.com <br /> CONTRACT STATE LISC#: SKANSUB985RT <br /> CONTRACTOR CITY OF EVERETT LISC#: 044389 <br /> BRIEF OVERVIEW OF PROJECT SCOPE: The 45-01 vertical structural upgrade is to ensure the building <br /> (Do not include electrical and mechanical structure meets current building code requirements following <br /> scope and costs. Contractors will secure the replacement of the eight stacker cranes, process mechanical <br /> these permits) and controls equipment and the replacement of two engine <br /> insert hoists with two engine insert hoist cranes located to the <br /> south end of the low bay rails.This is permit is for Phase 1 <br /> MEMBER STRENGTHENING. <br /> IN ADDITION TO PROVIDING THE ABOVE INFORMATION, PLEASE INCLUDE THE FOLLOWING <br /> DOCUMENTATION AS REQUIRED: <br /> For building permits, include (1) site plan), (2) full size drawing sets, (1) set of structural calcs, and any <br /> applicable energy code forms <br /> For pallet rack installations, include (1) site plan, (2) copies of Existing/Proposed layouts and (2) sets of <br /> structural calculations. <br /> For Public Work permits, include (1) site plan, (4)full size drawing sets and (2) sets of drainage calcs. <br /> For questions, please contact Todd Haberlack at 425-260-2668 or via email at todd.j.haberlack@boeing.com <br />