• • 6of16 <br /> Monday, February 3, 2020 : , <br /> :111114S. <br /> SCOPE OF WORK <br /> FOUNDATION SPECIALIST <br /> Crew to install 5 helical piers and lift to maximum structural recovery.Crew will need to remove and replace deck. Homeowner <br /> only wants to address the front foundation settlement at this time. Permit and engineering costs included. Lifetime transferable <br /> warranty included with piers. Has Dingo access <br /> L120 is in concurrence with pile layout recommended by R&R provided that the proposed layout is followed as marked and that a <br /> maximum pile spacing of 7'-0"o.c.. <br /> NOTES: <br /> 1. It is acceptable to install piles at the spacing shown with±0'-6"tolerance to allow for unexpected obstructions encountered during pile <br /> installation provided that no two adjacent spans exceed the spacing limitation of 7'-0"o.c.. <br /> 2. End piles are to be placed within 3'-0"of corner unless noted otherwise. <br /> LEVEL SURVEY <br /> 16' <br /> -1 5/8 -7/8 <br /> NORTH f� <br /> N <br /> Addition • o j <br /> <> = Helical Pier <br /> 1 3/8 0 Access 43' <br /> • <br /> 16' 0 - 1 - 1 -1/2 -5/8 <br /> LOCATE PILE <br /> WITHIN 1' OF <br /> DOORWAY <br /> • 1 •• N. <br /> -1 <br /> -1 3/8 -1 1/8 -5/8 <br /> LOCATE PILE <br /> 1 WITHIN 3' OF <br /> 1• <br /> 6' N. - 1 -1 1/2 -1 4 CORNER <br /> N - /8 - 1 - 1 -7/8 <br /> • <br /> 1 2 3 <>- e> 23' <br /> 3'-0" MAX ,�' 4 5 <br /> 11( <br /> (3) PILES @ 7'-0" OC MAX (2) PILES @ 7'-0" OC MAX <br /> NOTE:L120's scope is limited to the perimeter support systems/continuous footings of the primary structure.All stabilization and replacement efforts of <br /> interior elements,exterior decks,and deck supporting elements are outside of L120's contract and scope and are not addressed in this package. -L120 <br />