My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7505 SEAWAY BLVD 2021-02-22
>
Address Records
>
SEAWAY BLVD
>
7505
>
7505 SEAWAY BLVD 2021-02-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/22/2021 3:18:13 PM
Creation date
2/22/2021 3:14:43 PM
Metadata
Fields
Template:
Address Document
Street Name
SEAWAY BLVD
Street Number
7505
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
W ILK LEGEND ABBREVIATIONS GENERAL PROJECT NOTES <br /> WCLSEAL <br /> COMMUNITY TRANSIT CONTACTS EXISTING PROPOSED DESCRIPTION ABBREVIATION NAME OR PHRASE <br /> 1. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE PROJECT PLANS, SPECIFICATIONS,AND <br /> RIGHT-OF-WAY LINE AB ANCHOR BOLT SPECIAL PROVISIONS (CONTRACT DOCUMENTS)AND ALL WORK SHALL COMPLY WITH, IN ORDER OF <br /> PRECEDENCE: <br /> TODD JACOBS (425) 348-2367 W W WATER LINE AP ANGLE POINT * CONTRACT DOCUMENTS <br /> APPROX. APPROXIMATELY *WSDOT/APWA STANDARD SPECIFICATIONS FOR ROAD, BRIDGE AND MUNICIPAL <br /> ss SANITARY SEWER UNE CONSTRUCTION, 2016 EDITION <br /> PROJECT CONTACTS ASSY ASSEMBLY *WSDOT/APWA STANDARD PLANS FOR ROAD, BRIDGE AND MUNICIPAL CONSTRUCTION, CURRENT <br /> SD --- --- -- -- STORM DRAIN LINE(SOLID) EDN10N. <br /> BOW BOTTOM OF WALL <br /> NAME AGENCY PHONE G GAS LINE o <br /> CB CATCH BASIN 2. THE CONTRACTOR SHALL VERIFY ALL EXISTING DATA SHOWN IN THESE DOCUMENTS AND NOTIFY <br /> ENGINEER IMMEDIATELY OF ANY CONFLICTS WITH PROPOSED FEATURES PRIOR TO CONSTRUCTION. 0 P P POWER LINE CLR. CLEARANCE <br /> WINDI SHAPLEY OTAK (425) 822-4446 3. THE CONTRACTOR SHALL PROTECT ALL AREAS OUTSIDE THE WORK ZONE AND/OR OUTSIDE THE 13 3 <br /> T T TELEPHONE/COMMUNICATION UNE CO CLEAN OUT RIGHT-OF-WAY FROM DISTURBANCE.ALL DISTURBED AREAS SHALL BE FULLY RESTORED TO - 8as 2 <br /> PROPOSED OR PRE-EXISTING CONDITIONS. <br /> o a <br /> -x x CHAIN LINK FENCE CONC. CONCRETE 4. STORM DRAINAGE (SD) PIPE SHALL BE SCHEDULE A STORM SEWER PIPE UNLESS NOTED OTHERWISE. m <br /> a a WOOD FENCE CONT. CONTINUED 5. ALL DRAINAGE STRUCTURE STATION AND OFFSET TO CENTER OF STRUCTURE. <br /> ® WATER METER CPP CORRUGATED PLASTIC PIPE w <br /> 6. ALL COMPACTION METHODS, MATERIALS AND PERFORMANCE CRITERIA SHALL BE IN ACCORDANCE WITH o <br /> CSBC CRUSHED SURFACING BASE COURSE THE PROJECT PLANS AND SPECIFICATIONS. <br /> 10. FIRE HYDRANT d <br /> CSTC CRUSHED SURFACING TOP COURSE 7. AN APPROVED SET OF CONSTRUCTION PLANS FOR ALL WORK SHALL BE KEPT ON THE CONSTRUCTION <br /> M WATER VALVE SITE AT ALL TIMES. ----- --------- <br /> CT COMMUNITY TRANSIT <br /> UTILITY CONTACTS P BLOW OFF ASSEMBLY 8. A PRE-CONSTRUCTION CONFERENCE SHALL BE HELD WITH THE APPUCABLE JURISDICTIONS AND A s <br /> DIAM. DIAMETER COMMUNITY TRANSIT PRIOR TO STARTING ANY CONSTRUCTION ON THE PROJECT. .. ♦� <br /> O SANITARY MANHOLE E EAST 9. THE SOURCE OF SUPPLY OF EACH OF THE MATERIALS FURNISHED BY THE CONTRACTOR SHALL BE le r <br /> NAME AGENCY PHONE SUBMITTED TO THE ENGINEER FOR APPROVAL PRIOR TO DELNERY. ONLY MATERIALS CONFORMING TO 'R 3 -4 <br /> y V . <br /> o CLEAN OUT ELEV. or EL. ELEVATION THE REQUIREMENTS OF THE STANDARD SPECIFICATIONS AND APPROVED BY THE ENGINEER SHALL BE F;1,,•ai..i....o <br /> WASIM KHAN CITY OF BOTHELL (425) 806-6773 USED IN THE WORK.TESTING OF MATERIALS MAY INCLUDE TESTS OF ACTUAL SAMPLES, <br /> 0 STORM DRAIN MANHOLE EQ. EQUAL MANUFACTURER'S CERTIFICATIONS,APPROVAL OF CATALOG CUTS, OR FIELD ACCEPTANCE REPORTS. t0 <br /> --� E.W. EACH WAY 5/24/17 <br /> KIRK BROOKS CITY OF EVERETT (425) 257-8814 0➢ 1❑11 STORM DRAIN CATCH BASIN 10. ALL LOCATIONS OF EXISTING UTILITIES SHOWN HERE UPON HAVE BEEN ESTABUSHED BY FIELD <br /> SURVEY OR OBTAINED FROM AVAILABLE RECORDS AND SHOULD THEREFORE BE CONSIDERED <br /> FL FLOW LINE (ELEVATION) <br /> IT( GAS VALVE APPROXIMATE ONLY AND NOT NECESSARILY COMPLETE. IT IS THE SOLE RESPONSIBILITY OF THE <br /> SCOTT SMITH CITY OF MILL CREEK (425) 921-5708 FOC FACE OF CURB CONTRACTOR TO INDEPENDENTLY VERIFY THE ACCURACY OF'ALL UTIUTY LOCATIONS SHOWN AND <br /> GAS METER FURTHER DISCOVER AND AVOID ANY OTHER UTIUTIES NOT SHOWN HERE UPON WHICH MAY BE <br /> GRD. GRADE AFFECTED BY THE IMPLEMENTATION OF THE PLAN. UTIUTIES WHICH ARE NOT ABANDONED OR <br /> ROBERT WESTLAKE SNOHOMISH COUNTY 425 388-7551 -o- UTILITY POLE REMOVED SHALL BE PROTECTED,SUPPORTED, OR MAINTAINED DURING CONSTRUCTION.THE <br /> ( ) HMA HOT MIX ASPHALT CONTRACTOR SHALL CONTACT THE UNDERGROUND UTILITIES LOCATIONS SERVICE (811)AT LEAST 48 <br /> HOURS PRIOR TO CONSTRUCTION.THE OWNER AND THE ENGINEER SHALL BE CONTACTED IMMEDIATELY <br /> GREG WAGNER WSDOT (206) 440-4397 GUY ANCHOR HS HIGH STRENGTH IF A CONFLICT EXISTS. <br /> Z <br /> UTILITY POLE W/LIGHT HSS HOLLOW STRUCTURAL SECTION O <br /> PAUL RICHART ALDERWOOD WATER/WASTEWATER (425) 741-7967 xt LIGHT IE INVERT ELEVATION <br /> TUNG LE CENTURYLINK (206) 641-6622 ?� STREET LIGHT JT. JOINT V <br /> LF LINEAL FEET <br /> cL__-- TRAFFIC SIGNAL POLE CLEARING, GRADING AND TEMPORARY <br /> JOSEPH FORDON COMCAST (425) 263-5348 <br /> b^ PEDESTRIAN SIGNAL LT LEFT EROSION CONTROL <br /> MAX. MAXIMUM CO <br /> _ BRIAN SMITH FRONTIER COMMUNICATIONS (425) 263-4038 TRAFFIC SIGNAL CABINET Z <br /> MIC MONUMENT IN CASE 1. THE SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS) SHOWN IN THESE PLANS SHALL BE O <br /> I P I POWER VAULT MIN. CONSTRUCTED AND FUNCTIONAL BEFORE ANY CLEARING OR GRUBBING CAN BEGIN. <br /> ALAN SMITH LEVEL 3 COMMUNICATIONS (918) 547-0050 MINIMUM 2. CONSTRUCTION SHALL BE PHASED TO MINIMIZE THE EXTENT AND DURATION THAT ANY AREA IS U <br /> ❑� POWER TRANSFORMER N NORTH EXPOSED. • <br /> RICK MATTHEWS MUKILTEO WATER (425) 355-3355 I T I TELEPHONE VAULT NE NORTHEAST 3. INLET PROTECTION SHALL BE INSTALLED ON ALL EXISTING AND PROPOSED STORM DRAIN CATCH Z <br /> NO. NUMBER <br /> T TELEPHONE MANHOLEBASINS AND INLETS AT THE PROJECT SITE. O <br /> PARKER INDORF PUGET SOUND ENERGY (425) 463-6802 NW NORTHWEST 4. ALL CONSTRUCTION ACCESS LOCATIONS SHALL BE STABIUZED PRIOR TO BEGINNING CLEARING AND F <br /> o TELEPHONE RISER GRADING ACTIVITIES TO MINIMIZE THE TRACKING OF SEDIMENT ONTO PUBUC ROADS. IF SEDIMENT IS Q <br /> O.C. ON CENTER TRANSPORTED ONTO A ROAD SURFACE,THE ROAD SHALL BE CLEANED THOROUGHLY WITH <br /> RICK GILMORE SILVER LAKE WATER (425) 783-8391 © ELECTRICAL MANHOLE SELF-PROPELLED PICKUP STREET SWEEPER. STREET WASHING WITH WATER WILL NOT BE PERMITTED. <br /> o OHL OVERHEAD LINE 5. ALL TEMPORARY AND PERMANENT EROSION AND SEDIMENT CONTROL BMPS SHALL BE MAINTAINED V! <br /> El ELECTRICAL HAND HOLE AND REPAIRED AS NEEDED TO ASSURE CONTINUED PERFORMANCE OF THEIR INTENDED FUNCTION <br /> JOHN GREGORY SNOHOMISH PUD (425) 783-8391 PC POINT OF CURVATURE UNLESS OTHERWISE SPECIFIED.WHEN THE DEPTH OF ACCUMULATED SEDIMENT AND DEBRIS REACHES i-+ <br /> o oE� ELECTRICAL METER APPROXIMATELY ONE-THIRD THE HEIGHT OF THE BMP THE DEPOSITS SHALL BE REMOVED AND O� CI <br /> PCC POINT OF COMPOUND CURVE LEGALLY DISPOSED OF OFFSITE.VISUAL MONITORING OF THE BMPS WILL BE CONDUCTED BY THE in W z <br /> GARY VERVALIN WAVE BROADBAND (425) 896-1958 o CABLE N RISER I?. PROP LINE CONTRACTOR'S ESC LEAD AT LEAST ONCE EVERY CALENDAR WEEK AND WITHIN 24 HOURS OF ANY C Z W <br /> RAINFALL EVENT. U <br /> © CABLE 1V MANHOLE PRC POINT OF REVERSE CURVE 2/ J� <br /> 6. ALL TEMPORARY EROSION AND SEDIMENT CONTROL BMPS SHALL BE REMOVED WITHIN 30 DAYS AFTER Z <br /> o PT POINT OF TANGENCY FINAL SITE STABIUZATION IS ACHIEVED OR WHEN THE ENGINEER DETERMINES THAT THE TEMPORARY <br /> N SIGN ` <br /> BMP IS NO LONGER NEEDED. THE CONTRACTOR SHALL REMOVE THE ITEM,THEN CLEAN, RESTORE ^ �_ <br /> c6i coo ® RETAINING WALL RT RIGHT AND PERMANENTLY STABIUZE ALL DISTURBED AREAS TO THE ENGINEER'S SATISFACTION.TRAPPED W w17. <br /> i SEDIMENT SHALL BE REMOVED OR STABILIZED ON SITE. ( W OQ <br /> R/W RIGHT-OF-WAY <br /> 0 <br /> � � ROCK WALL S SOUTH 7. THIS PLAN MAY BE MODIFIED BY THE CONTRACTOR'S ESC LEAD OR THE ENGINEER IN THE FIELD AS �Z <br /> o NECESSARY TO CONTROL EROSION AND THE MIGRATION OF SEDIMENTS AT THE PROJECT SITE. 3CK <br /> N 00000 MAIL BOX(ES) SD STORM DRAIN E JCO <br /> 8. PROPOSED CATCH BASINS SHALL BE LEFT LOW TO DRAIN AND RAISED AT THE TIME OF FINAL UFT. Q m <br /> oa SDCO STORM DRAIN CLEAN OUT EASPHALT CONCRETE PAVEMENT <br /> z.,,, • wQ <br /> to CEMENT CONCRETE SE SOUTHEAST 0 LII Z10 <br /> °� CONIFER TREE SS SANITARY SEWER \ CO�Q <br /> n OV <br /> 0 DECIDUOUS TREE STA STATION <br /> STD STANDARD O <br /> t co IRRIGATION CONTROL BOX <br /> A SW SOUTHWEST <br /> E + MONITORING WELL <br /> TBD TO BE DETERMINED <br /> SURVEY CONTROL POINT TESC TEMPORARY EROSION & SEDIMENT CONTROL FlamdGlobal Partner <br /> E <br /> ,, ® SURVEY MONUMENT TOC TOP OF CURB 11241 Willows Road NE <br /> Suite 200 <br /> FIRE DEPT. CONNECTION TOW TOP OF WALL Redmond, ) o98052 <br /> Phone:(425) 4446 <br /> N <br /> SIGNAL LIGHT TYP. TYPICAL (-V <br /> FAX:(425)827-9577 <br /> N www.otak.com <br /> N © WATER MANHOLE WSDOT WA. STATE DEPT. OF TRANSPORTATION <br /> 32130T <br /> 8' -0- OIL FILL W.S. WATER SURFACE Project No. <br /> .. W/ WITH CO.02 <br /> • °' <br /> CULVERT <br /> Drawing No. <br /> 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.